A closer look at a team working on assembling escalator segments for the upper floors.
A closer look at a team working on assembling escalator segments for the upper floors. Click to switch to large image view
The smaller ones from 5 to 6 and 3 to 4 have been installed.
The smaller ones from 5 to 6 and 3 to 4 have been installed. Click to switch to large image view
They have started to paint/seal the lower level face of the structure as forms for the 5th level are taking shape.