home > Disneyland Resort > Pictures > Friday, January 26, 2018 - Image 1 of 3 on Page 15 of 108
A new pathway has been cut into the level and asphalt filled in the holes.  So it looks like the trams will make a right almost as soon as they enter the structure.  Then loop around and come back out through the current walkway (where the CM is standing in the distance). The tramway will then go out and make a u-turn near where the wheel chair ramp was removed and rejoin the existing path there.