home > Disneyland Resort > Pictures > Friday, December 4, 2009

This page is to help you quickly jump through this picture set. Below you will see a listing of the pages and the captions on that page.

  • Page Number: 1
    We headed to DCA first
    They were expecting heavy crowds again. Everyone was required to get a handstamp
    Noticed another sign up on the blocked off walkway to direct people either direction.
  • Page Number: 2
    You could not see much through the fences.. but there was plastic up which makes me think concrete work was done recently
    No visible progress here
    Noticed some tables by the coffee cart
  • Page Number: 3
    The Bay is now refilled
    Looks like a leak or a test on the far side
    A boat is now used to meet the platform
  • Page Number: 4
    A second trailer is now out in the viewing area
    More forms near the fountain
  • Page Number: 5
    Here you can see how far up the water comes
    A closer shot
    Noticed the new trashcan logos
  • Page Number: 6
    One of the work boats
  • Page Number: 7
    No real visible progress on the swings from here
  • Page Number: 8
    Looks like steps leading down to the fountain
    More floats for under the platform to help level it off
  • Page Number: 9
    The water is still fairly clear
  • Page Number: 10
    Here you can really see the water at this joint
  • Page Number: 11
    A good shot showing the feed pipe for the screen.
    Then all a worker came over and they turned it on..
    Here you can get a good feel for the scale
  • Page Number: 12
    A shot of one of the other screen heads
  • Page Number: 13
    A look over the walls at the swings work
    the curb is in..
    The area near the old Rustworthy area is leveled off.
  • Page Number: 14
    Over at the Disneyland Hotel the elevator has been removed and more painting is complete
    A diving boat/barge
    A better shot of the two trailers that are being used for testing and programming
  • Page Number: 15
    Most of the concrete looks to be replaced now. Just one strip left.
    Another test of the screen
    More rebar going into the Little Mermaid building
  • Page Number: 16
    Looks like some concrete has been poured on the far side
    Back to the viewing area, notice the fresh concrete on the top of the shot.
  • Page Number: 17
    Over at the Cars Land the forms are down on some of the support sides.
  • Page Number: 18
    They are drilling holes which look to be where the show building will be.
    A better shot of the Mermaid site
    More pipe/trench work oun in Cars Land
  • Page Number: 19
    Working on the pipes
    Random cable shots
  • Page Number: 20
    Not much visible progress on the elevator tower of the swings
    Here you can see where the extra floats will be going
  • Page Number: 21
    Another test
  • Page Number: 22
    The work near the Zephyr exit.
  • Page Number: 23
    A couple more shots from the Zephyr to close out the construction shots.
  • Page Number: 24
    The trees near the coffee/pin carts were filled with these little birds (and they were loud)
    Small free standing, temporary signs are now out in Bugsland instead of the wait time ones that used to be there
  • Page Number: 25
    Walls are up next to Fliks Flyers.. rumor is this backstage gate will connect to the one by Tower soon.. so there will no longer be a dead end
    Work on the new stroller buildijng is moving along slowly
  • Page Number: 26
    Noticed the Remember poster is now the Holdiday Believe one.
    Town Square has a lot of Candlelight gear set up.
  • Page Number: 27
  • Page Number: 28
  • Page Number: 29
    No signs of the new Lincoln sign yet
    The lobby is currently closed (my guess the temporary wall inside is being removed.
  • Page Number: 30
    A random shot of the tree on Main Street
    The wait times around 3:00pm
  • Page Number: 31
    Noticed all the props now have gold backgrounds which make them easier to see
    The pardoned turkey was out
    Two name tags but only one turkey
  • Page Number: 32
    We went for a trip on the recently reopened Casey Jr.
  • Page Number: 33
  • Page Number: 34
    Next up Small World Holiday
  • Page Number: 35
  • Page Number: 36
  • Page Number: 37
    There is now a sign and some flags up at the new snack shack
    While in line for the Haunted Mansion noted they had lights for the 4:15 showboat show
  • Page Number: 38
    They were using the center Fantasmic tower
    A random HM shot
    As the boat returned to dock they turned the lights back on
  • Page Number: 39
  • Page Number: 40
    Back over to DCA. The lights were on in the trailers. I spotted one person inside
    A crew finishing up some forms
  • Page Number: 41
    The one boat was parked under the walkway, wonder if this will be its permanent port.
  • Page Number: 42
    Only one light was on along the rocks of the launch and of course it was in the reflect area in the picture...
  • Page Number: 43
    There were two workers raising and lowering the light rigs
    A better shot of the table/benches by the coffee cart
  • Page Number: 44
    No signs of work on the Tower side of the gate
    Stopped by Monsters, which was a walk on.
    Roz was decked out for the Holidays.
  • Page Number: 45
    Back to Disneyland... only a 10 minute wait for Nemo
    Some pictures of the 7:30 snow event
  • Page Number: 46
    The line board around 7:40pm
  • Page Number: 47
    Rumors are that Honey I Shrunk the audience will be closing soon so I stopped by
  • Page Number: 48
    An attempt at a shot of the film
    Buzz was next
  • Page Number: 49
    One of the longest lines in the park.. for Coke Corner..
    The doors in the Gallery were closed, so you could not access the Opera House Lobby
  • Page Number: 50
    From the hat shop you could see into the lobby of the Opera House
  • Page Number: 51
    To close with some pictures of the snow on Main Street.
Back to previous page