home > Disneyland Resort > Pictures > Friday May 16, 2008

This page is to help you quickly jump through this picture set. Below you will see a listing of the pages and the captions on that page.

  • Page Number: 1
    They are still replacing the glass in the parking structure
    A new banner up at the parking structure exit
  • Page Number: 2
    The sign that was run into a couple weeks ago is covered/gone.
    Starting next week an Indiana Jones promotion
    Work continues on the foutain
  • Page Number: 3
    Everything seems to be in bloom around the parks
    The new railing has been installed behind the walls
  • Page Number: 4
    Over at Disneyland a healthy crowd
    The line board around 1:45pm
  • Page Number: 5
    The large banners on the side of the castle are gone
    The new Mark VII monorail going by the Matterhorn
  • Page Number: 6
    They were only testing it, so no guest access, the CM said they are day to day with the testing.
  • Page Number: 7
  • Page Number: 8
    They are re-working the waterfalls, the new rockwork looks almost complete
  • Page Number: 9
    One sub not in service today.
    Monorail Purple is still running for guest service
  • Page Number: 10
  • Page Number: 11
  • Page Number: 12
    A look at the underside..
    For comparison, the old
    And the new
  • Page Number: 13
    The doors still work the same as the current ones, release buttons on the cab to open then individual door buttons to close
    A look inside, there are benches that go down the middle so you face outward then on either end benches facing front/back.
  • Page Number: 14
    The back
  • Page Number: 15
    Still one bird missing.
  • Page Number: 16
    The other waterfall is having some work done too and its down to a trickle.
  • Page Number: 17
    Some repainting.
    Small World is still under wraps
  • Page Number: 18
    The topiaries are looking more lifelike (more green than a few months ago)
  • Page Number: 19
    No sign of the barrels at the gas station
    Due to the heat the park was closed
  • Page Number: 20
    A private party at the festival arena
    The ranch was closed, they were rounding up the goats.
    One of the counters for the BBQ was behind a wall
  • Page Number: 21
    The location was still open though, just reduced seating.
    Now a trip on the Jungle Cruise
    A real duck..
  • Page Number: 22
    Finally got a good shot of the explosion as you approach the camp
  • Page Number: 23
    No visible progress here
    The line board around 2:45pm
  • Page Number: 24
    Back to DCA, and Tough to Be a Bug is down for rehab
    The bridge in the Wharf looked to have new planks.
  • Page Number: 25
    Toy Story Mania has less walls now..
    The railing has been repainted, and it lost some of its detial in the process.
  • Page Number: 26
    The old in the background, the new in the forground
    The gift shop is now open.
    As is the ODV stand and shade structures
  • Page Number: 27
    For more shots of the are be sure to check out our Construction Progress section on Sunday.
    The new ODV stand
    The menu...
  • Page Number: 28
    A look into the gift shop
  • Page Number: 29
    The exit for the attraction.
  • Page Number: 30
    The pins say Toy Story Mania (as does all the merchandise, but the main sign says Toy Story Midway Mania as does the coming soon blurb in the guidemap).
  • Page Number: 31
    The other new ODV location is still being worked on.
    The work backstage seems to be nearing completion
  • Page Number: 32
    The parking lot is back to normal (no more trench)
    But the work is now going on the other parking lot (Timon)
  • Page Number: 33
    The Grand California work is progressing (for more shots check out the Construction Progress section tomorrow)
  • Page Number: 34
    The Corn Dog Castle is being worked on.
  • Page Number: 35
    The work on GRR is still ongoing too
    As is the project along the hotel under the monorail track.
  • Page Number: 36
    The walls are down by the Grand CA pool entrance near White Water Snacks
    A couple more shots of the DVC work
  • Page Number: 37
    Remember more shots will be in the Construction Progress section.
    One of the windows as you walk to Downtown Disney now features wedding gowns
  • Page Number: 38
    The restrooms near Carnation are being worked on.
  • Page Number: 39
    Over to DCA for the Pixar Play Parade
    Every time I watch it things change.. these guys are back off their stilts again
    But the bungee rats are back.
  • Page Number: 40
    The bugs unit is still just the one small piece
  • Page Number: 41
    No visible progress here
    The seats are back in the Animation lobby
  • Page Number: 42
    One area is blocked off as stroller parking
    The middle school that was doing the pre-parade had a large cheering section.
    The band going by.
  • Page Number: 43
    The Segway experience now has a backdrop, it appears to be a canvas and it matches the one over by Buzz.
    The VMK is still going, for a couple more days.
  • Page Number: 44
    Guess the tree is staying since previews start in a couple weeks and it is still there.
  • Page Number: 45
    A look into the cab of the new monorail
  • Page Number: 46
    In Star Traders you can now build your own lightsaber.
    There are quite a few steps (10 I believe)
  • Page Number: 47
  • Page Number: 48
  • Page Number: 49
    The front lights are white/yellowish
    The rear are white/blueish
  • Page Number: 50
    Back to DCA for some Toy Story Midway Mania shots
  • Page Number: 51
    A look into the new shack
  • Page Number: 52
    Mr Potatohead sits silently still
    Noticed the Orange Stinger had all its lights off.
    Then a minute or so later everything came back on.
  • Page Number: 53
    The electrical parade
    Saw this gift card on the ticket booths, I like the idea of marketing mothers day, fathers day, and graduation.
  • Page Number: 54
    The current guidemaps
    In both maps there is an ad for the opening of Toy Story Mania as well as the Indiana Jones promotion
Back to previous page