A look at the 4th floor elevator shaft that is taking shape.  Looks like the interior walls are installed.
A look at the 4th floor elevator shaft that is taking shape. Looks like the interior walls are installed. Click to switch to large image view
The walls in the Tram Plaza have been reconfigured.  They are now moved right up to/around the escalators and elevators so work can start on the last sections.
The walls in the Tram Plaza have been reconfigured. They are now moved right up to/around the escalators and elevators so work can start on the last sections. Click to switch to large image view
The main center part of the project is now open.