home > Disneyland Resort > Pictures > Friday, January 18, 2019 - Page 10 of 130 - << previous page : next page >>
Moving over to the south facing side of the structure and a look at the new parking structure escalator area.  Since my last visit the 5th floor pair have been installed and the 3rd floor ones are on site and being prepared to be lifted into position.
Moving over to the south facing side of the structure and a look at the new parking structure escalator area. Since my last visit the 5th floor pair have been installed and the 3rd floor ones are on site and being prepared to be lifted into position. Click to switch to large image view
A closer look at the 2nd floor set, covered to protect them from the rain last week.
A closer look at the 2nd floor set, covered to protect them from the rain last week. Click to switch to large image view
Here are the 3rd floor set, a team is working on the support structure for them.
Here are the 3rd floor set, a team is working on the support structure for them. Click to switch to large image view