Support columns for the 5th floor are rising up on the back portion of the garage.  The fourth floor is poured in this area.
Support columns for the 5th floor are rising up on the back portion of the garage. The fourth floor is poured in this area. Click to switch to large image view
Looking out you can see the arm for a concrete pumper on the far side as they work on a portion of the garage over there.
Looking out you can see the arm for a concrete pumper on the far side as they work on a portion of the garage over there. Click to switch to large image view