All the temporary supports are removed from the original portions of the two ramps.  The lower ramp is being connected to the 4th floor and the upper one looks like it will go to the roof span/bridge.
All the temporary supports are removed from the original portions of the two ramps. The lower ramp is being connected to the 4th floor and the upper one looks like it will go to the roof span/bridge. Click to switch to large image view
On the far side of the structure work on the back span looks to be done on the 3rd level and going up to the 4th now.
On the far side of the structure work on the back span looks to be done on the 3rd level and going up to the 4th now. Click to switch to large image view
Survey tools on the roof where the connection will be today.
Survey tools on the roof where the connection will be today. Click to switch to large image view