home > Disneyland Resort > Pictures > Friday, September 14, 2018 - Page 8 of 99 - << previous page : next page >>
Moving over to the garage the third level looks to have about a 1/4th of it poured now.  Work continues on the second level and third level as the structure expands toward Magic Way and up.
Moving over to the garage the third level looks to have about a 1/4th of it poured now. Work continues on the second level and third level as the structure expands toward Magic Way and up. Click to switch to large image view
Supports and forms are being erected for the 3rd floor connection to the Mickey and Friends structure.
Supports and forms are being erected for the 3rd floor connection to the Mickey and Friends structure. Click to switch to large image view
A closer look.
A closer look. Click to switch to large image view