home > Disneyland Resort > Pictures > Friday, September 7, 2018 - Page 13 of 136 - << previous page : next page >>
The back half of the garage is having the second floor poured and taking shape.
The back half of the garage is having the second floor poured and taking shape. Click to switch to large image view
The first sections of the second ramp have been poured and the next ones look just about ready for concrete.
The first sections of the second ramp have been poured and the next ones look just about ready for concrete. Click to switch to large image view
In the back of the structure another connection to the Mickey and Friends garage.
In the back of the structure another connection to the Mickey and Friends garage. Click to switch to large image view