Moving to the other side of the garage and a look at the new Parking Structure construction.  On the far side nearest Magic Way the second floor has been poured and supports going up for the 3rd floor.
Moving to the other side of the garage and a look at the new Parking Structure construction. On the far side nearest Magic Way the second floor has been poured and supports going up for the 3rd floor. Click to switch to large image view
A closer look.
A closer look. Click to switch to large image view
Here you can see the supports for the 3rd floor being installed.
Here you can see the supports for the 3rd floor being installed. Click to switch to large image view