It appears that the ramp layout will be different for this structure.  The one that is being poured already has a connection to levels 2 and 3 and looks to still be going up.  Wonder if these will be an entrance and exit ramp with each one reaching every floor..
It appears that the ramp layout will be different for this structure. The one that is being poured already has a connection to levels 2 and 3 and looks to still be going up. Wonder if these will be an entrance and exit ramp with each one reaching every floor.. Click to switch to large image view
The second ramp status.  Looks like one section is prepared to be poured.
The second ramp status. Looks like one section is prepared to be poured. Click to switch to large image view
This appears to be the next section of the ground level to receive concrete.
This appears to be the next section of the ground level to receive concrete. Click to switch to large image view