home > Disneyland Resort > Pictures > Friday, January 12, 2018 - Page 6 of 98 - << previous page : next page >>
To the right toward Critter Country the dirt has been filled to the roof of the structure.  They are now sealing the roof and looks like dirt will cover that too.
To the right toward Critter Country the dirt has been filled to the roof of the structure. They are now sealing the roof and looks like dirt will cover that too. Click to switch to large image view
Moving back to the tallest peaks on the far left of the site.
Moving back to the tallest peaks on the far left of the site. Click to switch to large image view
Panning right to the shorter of the peaks visible over the Battle Escape Building.  The scaffolding is up and it looks ready for concrete.
Panning right to the shorter of the peaks visible over the Battle Escape Building. The scaffolding is up and it looks ready for concrete. Click to switch to large image view