home > Disneyland Resort > Pictures > Friday, November 3, 2017 - Page 4 of 125 - << previous page : next page >>
More exterior siding is being installed on the side along Disneyland Drive.
More exterior siding is being installed on the side along Disneyland Drive. Click to switch to large image view
Siding panels waiting to be installed.
Siding panels waiting to be installed. Click to switch to large image view
The emergency/access stairs are being installed.
The emergency/access stairs are being installed. Click to switch to large image view