home > Disneyland Resort > Pictures > Friday, November 3, 2017 - Page 3 of 125 - << previous page : next page >>
Preparations are underway for the floor concrete to be poured soon.
Preparations are underway for the floor concrete to be poured soon. Click to switch to large image view
The left portion looks ready to go with rebar and other elements installed.
The left portion looks ready to go with rebar and other elements installed. Click to switch to large image view
The right portion is still being worked on.
The right portion is still being worked on. Click to switch to large image view