On the roof more HVAC equipment has been installed.
On the roof more HVAC equipment has been installed. Click to switch to large image view
Preparations for the exterior wall are underway on the side of the building.
Preparations for the exterior wall are underway on the side of the building. Click to switch to large image view
Looking inside the hanger area conduit and more forms are being installed as the prepare to pour the floor.
Looking inside the hanger area conduit and more forms are being installed as the prepare to pour the floor. Click to switch to large image view