Disneygeek's Disneyland Update Friday, September 15, 2017 (Page 5 of 134)
  home > Disneyland Resort > Pictures > Friday, September 15, 2017 - Page 5 of 134 - << previous page : next page >>
Click to switch to large image view
A better view of the wire mesh that has been attached to the steel supports.  Also note the last section of the Millennium Falcon roof on the right is being prepped for concrete.
A better view of the wire mesh that has been attached to the steel supports. Also note the last section of the Millennium Falcon roof on the right is being prepped for concrete. Click to switch to large image view
Preparations for the exterior wall of the Millennium Falcon show building along the backstage road.
Preparations for the exterior wall of the Millennium Falcon show building along the backstage road. Click to switch to large image view