This area is slowly taking shape (I read the opening was pushed back a few weeks)
This area is slowly taking shape (I read the opening was pushed back a few weeks) Click to switch to large image view
Concrete has been poured and the bolts are ready for whatever is going to be attached to be installed.
Concrete has been poured and the bolts are ready for whatever is going to be attached to be installed. Click to switch to large image view
Are they painting the equipment housings?
Are they painting the equipment housings? Click to switch to large image view