8.25.09 -
8.25.09
8.25.09 -
8.25.09
8.25.09 - In this shot you can see the wall for the first tier is taking shape, the brick/stone design.
In this shot you can see the wall for the first tier is taking shape, the brick/stone design. 8.25.09
8.25.09 -
8.25.09
8.25.09 - Equipment waiting to be installed
Equipment waiting to be installed 8.25.09
8.25.09 - A closer look
A closer look 8.25.09
8.25.09 - They had boards on the new steelwork as a temporary walk platform
They had boards on the new steelwork as a temporary walk platform 8.25.09
8.25.09 - Here they are working on the wall
Here they are working on the wall 8.25.09
8.25.09 - More equipment to install in the lagoon.
More equipment to install in the lagoon. 8.25.09
Back to previous page