06.26.09 - The viewing area from ground level
The viewing area from ground level 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - A look out on the platform
A look out on the platform 06.26.09
06.26.09 -
06.26.09
06.26.09 - The control booth looks just about done (well the structure)
The control booth looks just about done (well the structure) 06.26.09
06.26.09 - Noticed some wood out in this area.. maybe whatever is going there is coming soon.
Noticed some wood out in this area.. maybe whatever is going there is coming soon. 06.26.09
06.26.09 - Same with this one (also notice the extra line that is run out there to the left.
Same with this one (also notice the extra line that is run out there to the left. 06.26.09
06.26.09 - The tower near Screamin has scaffolding and some sort of red tent near by.
The tower near Screamin has scaffolding and some sort of red tent near by. 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - Tarps up around this tower..  wonder if that is to keep stuff in or out?
Tarps up around this tower.. wonder if that is to keep stuff in or out? 06.26.09
06.26.09 - The viewing area from the Zephyr
The viewing area from the Zephyr 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - Looks like two machines to pull cable are out now.
Looks like two machines to pull cable are out now. 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - More track/trays for the cables is going in to connect to the backstage area.
More track/trays for the cables is going in to connect to the backstage area. 06.26.09
06.26.09 - Here is that area with the extra line running to it that we spotted from the other side of the Bay
Here is that area with the extra line running to it that we spotted from the other side of the Bay 06.26.09
06.26.09 - More cable has been pooled and pipes installed
More cable has been pooled and pipes installed 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - Here you can see one of the pull strings
Here you can see one of the pull strings 06.26.09
06.26.09 - As well as the cable ties
As well as the cable ties 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - The supports are in, and I would guess the tracks are coming soon.
The supports are in, and I would guess the tracks are coming soon. 06.26.09
06.26.09 - The cable spools
The cable spools 06.26.09
06.26.09 - The blue pipe is being put in next to the tracks.
The blue pipe is being put in next to the tracks. 06.26.09
06.26.09 - A look at the cables
A look at the cables 06.26.09
06.26.09 - Here is how they pull them, over the rollers.
Here is how they pull them, over the rollers. 06.26.09
06.26.09 -
06.26.09
06.26.09 - A closer look at the tower by Screamin
A closer look at the tower by Screamin 06.26.09
06.26.09 - The wave machine looks to be almost fully installed again
The wave machine looks to be almost fully installed again 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - A new bridge for workers has been installed near the Zephyr
A new bridge for workers has been installed near the Zephyr 06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 -
06.26.09
06.26.09 - The tracks near the control booth are not connected yet.
The tracks near the control booth are not connected yet. 06.26.09