03.26.09 - No visible progress on the restrooms
No visible progress on the restrooms 03.26.09
03.26.09 - Out in the viewing area the wall is being lowered
Out in the viewing area the wall is being lowered 03.26.09
03.26.09 -
03.26.09
03.26.09 - One of the support columns that looks like it is ready to be poured or has just been poured (hard to tell)
One of the support columns that looks like it is ready to be poured or has just been poured (hard to tell) 03.26.09
03.26.09 - Another column taking shape
Another column taking shape 03.26.09
03.26.09 - A wider shot of the Bay
A wider shot of the Bay 03.26.09
03.26.09 - Here you can see the section of wall that has already been cut down
Here you can see the section of wall that has already been cut down 03.26.09
03.26.09 - A wider shot
A wider shot 03.26.09
03.26.09 - A close up showing where they will be lowering the wall to, you can see the cut near the bottom of the second row.
A close up showing where they will be lowering the wall to, you can see the cut near the bottom of the second row. 03.26.09
03.26.09 -
03.26.09
03.26.09 - The final clean up work is done by hand
The final clean up work is done by hand 03.26.09
03.26.09 - Noticed this column that was completed recently looks like it will have a slopped top
Noticed this column that was completed recently looks like it will have a slopped top 03.26.09
03.26.09 - Under the bridge leading to the Pier (near Ariels)
Under the bridge leading to the Pier (near Ariels) 03.26.09
03.26.09 -
03.26.09
03.26.09 - Out in the Bay more equipment has been installed
Out in the Bay more equipment has been installed 03.26.09
03.26.09 -
03.26.09
03.26.09 - Out by the Orange Stinger the concrete is being replaced where they installed a new pipe
Out by the Orange Stinger the concrete is being replaced where they installed a new pipe 03.26.09
03.26.09 -
03.26.09
03.26.09 - Where the pipe enters the bay (well the area behind the new retaining wall
Where the pipe enters the bay (well the area behind the new retaining wall 03.26.09
03.26.09 -
03.26.09
03.26.09 -
03.26.09
03.26.09 - A closer shot
A closer shot 03.26.09
03.26.09 -
03.26.09
03.26.09 -
03.26.09
03.26.09 -
03.26.09
03.26.09 - Looks like they were assembling some piping out in the bay
Looks like they were assembling some piping out in the bay 03.26.09
03.26.09 -
03.26.09
03.26.09 -
03.26.09
03.26.09 -
03.26.09
03.26.09 - This is one of the small holes along the wall that several weeks ago had rebar in it and looked ready to go.. now it has less rebar and looks ready to be poured..
This is one of the small holes along the wall that several weeks ago had rebar in it and looked ready to go.. now it has less rebar and looks ready to be poured.. 03.26.09
03.26.09 -
03.26.09
03.26.09 - One of the supports being cut to the proper height
One of the supports being cut to the proper height 03.26.09
03.26.09 -
03.26.09
Back to previous page