8.08.24 - Most of the facade work looks to be complete now.
Most of the facade work looks to be complete now. 8.08.24
8.08.24 - Steaming by on the Mark Twain Riverboat
Steaming by on the Mark Twain Riverboat 8.08.24
8.08.24 - The hole is being patched up in the rock work.
The hole is being patched up in the rock work. 8.08.24
8.08.24 - More plants waiting to be installed
More plants waiting to be installed 8.08.24
8.08.24 - No water in the flume or testing going on this afternoon
No water in the flume or testing going on this afternoon 8.08.24
8.08.24 - Some scaffolding still up on the left side
Some scaffolding still up on the left side 8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 - Looking up river the Hungry Bear is still behind scrims
Looking up river the Hungry Bear is still behind scrims 8.08.24
8.08.24 -
8.08.24
8.08.24 - The second set of construction walls were down so you could see into Critter Country now.
The second set of construction walls were down so you could see into Critter Country now. 8.08.24
8.08.24 - A lot of activity as they move to complete this area.
A lot of activity as they move to complete this area. 8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 - Looking back at the bridge rebar is in and it looks ready for concrete
Looking back at the bridge rebar is in and it looks ready for concrete 8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 - Repainting the fence along the walkway near the restrooms
Repainting the fence along the walkway near the restrooms 8.08.24
8.08.24 -
8.08.24
8.08.24 -
8.08.24
8.08.24 - A closer look at the gift shop.
A closer look at the gift shop. 8.08.24
8.08.24 -
8.08.24