10.04.24 - 6 weeks until opening on Nov 15th
6 weeks until opening on Nov 15th 10.04.24
10.04.24 - No testing at the moment
No testing at the moment 10.04.24
10.04.24 - The exterior on this side looks complete
The exterior on this side looks complete 10.04.24
10.04.24 -
10.04.24
10.04.24 -
10.04.24
10.04.24 - Up River the Hungry Bear is still closed for renovation but looks ready to open soon.
Up River the Hungry Bear is still closed for renovation but looks ready to open soon. 10.04.24
10.04.24 - The gift shop and walkway are still behind walls
The gift shop and walkway are still behind walls 10.04.24
10.04.24 - Looking back
Looking back 10.04.24
10.04.24 -
10.04.24
10.04.24 - The sign has not moved
The sign has not moved 10.04.24
10.04.24 -
10.04.24
10.04.24 - Now a look from ground level.  Notice the team walking the flume conducting an inspection/walkthrough it appeared.
Now a look from ground level. Notice the team walking the flume conducting an inspection/walkthrough it appeared. 10.04.24
10.04.24 -
10.04.24
10.04.24 -
10.04.24
10.04.24 - Scaffolding still up on the building nearest the train track.
Scaffolding still up on the building nearest the train track. 10.04.24
10.04.24 -
10.04.24
10.04.24 -
10.04.24
10.04.24 -
10.04.24
10.04.24 -
10.04.24
10.04.24 -
10.04.24
10.04.24 - The drinking fountain near Pooh Corner has been replaced.
The drinking fountain near Pooh Corner has been replaced. 10.04.24
10.04.24 - A Bayou Country sign.
A Bayou Country sign. 10.04.24
10.04.24 -
10.04.24
10.04.24 -
10.04.24
Back to previous page