9.15.17 - An overview of the Battle Escape Building from the Mickey and Friends Parking Structure.
An overview of the Battle Escape Building from the Mickey and Friends Parking Structure. 9.15.17
9.15.17 - On the roof more HVAC and other equipment continues to be installed
On the roof more HVAC and other equipment continues to be installed 9.15.17
9.15.17 -
9.15.17
9.15.17 - The Millennium Falcon building.
The Millennium Falcon building. 9.15.17
9.15.17 - Looking inside it appears there is a lot of scaffolding up.
Looking inside it appears there is a lot of scaffolding up. 9.15.17
9.15.17 - Most of the roof has been poured on the building.
Most of the roof has been poured on the building. 9.15.17
9.15.17 - Wire mesh for the mountains/rock work is being attached to the steel supports.
Wire mesh for the mountains/rock work is being attached to the steel supports. 9.15.17
9.15.17 - Another pan across the Battle Escape Building.
Another pan across the Battle Escape Building. 9.15.17
9.15.17 - You can see steel supports for more rock work on the far side.
You can see steel supports for more rock work on the far side. 9.15.17
9.15.17 -
9.15.17
9.15.17 - What appears to be a service entrance taking shape on the second floor of the Battle Escape building.
What appears to be a service entrance taking shape on the second floor of the Battle Escape building. 9.15.17
9.15.17 - A closer look at the rock formations taking shape.
A closer look at the rock formations taking shape. 9.15.17
9.15.17 - Preparations underway for the exterior wall of the Millennium Falcon building.
Preparations underway for the exterior wall of the Millennium Falcon building. 9.15.17
9.15.17 - The Battle Escape building looks ready for the exterior paneling/wall.
The Battle Escape building looks ready for the exterior paneling/wall. 9.15.17
9.15.17 - Preparing to pour concrete on another section of the Millennium Falcon building roof.
Preparing to pour concrete on another section of the Millennium Falcon building roof. 9.15.17
9.15.17 - A wider view of the service entrance.  The workers help with the scale of the entry point and building.
A wider view of the service entrance. The workers help with the scale of the entry point and building. 9.15.17
9.15.17 - The wall has not been completed yet from the concrete structure going to the right.  In the distance looks to be a truck with more fencing for something.
The wall has not been completed yet from the concrete structure going to the right. In the distance looks to be a truck with more fencing for something. 9.15.17
9.15.17 -
9.15.17
9.15.17 - No visible progress on the concrete building.
No visible progress on the concrete building. 9.15.17
9.15.17 - Inside the hanger portion of the Battle Escape building they are preparing to pour a concrete floor.
Inside the hanger portion of the Battle Escape building they are preparing to pour a concrete floor. 9.15.17
9.15.17 -
9.15.17
9.15.17 -
9.15.17
9.15.17 - Another view of the scaffolding and rock work preparations under way in the distance.
Another view of the scaffolding and rock work preparations under way in the distance. 9.15.17
9.15.17 - Compacting some dirt on the other side of the building as they prepare to work on the other structures and walkways.
Compacting some dirt on the other side of the building as they prepare to work on the other structures and walkways. 9.15.17
9.15.17 - A team on top of a structure on the Battle Escape roof.
A team on top of a structure on the Battle Escape roof. 9.15.17
9.15.17 - From the Big Thunder Trail you get a better view of the mountains taking shape.
From the Big Thunder Trail you get a better view of the mountains taking shape. 9.15.17
9.15.17 -
9.15.17
9.15.17 -
9.15.17
9.15.17 -
9.15.17
9.15.17 - From Toontown.
From Toontown. 9.15.17
9.15.17 - A series of pictures from the top deck of the Mark Twain.
A series of pictures from the top deck of the Mark Twain. 9.15.17
9.15.17 -
9.15.17
9.15.17 -
9.15.17
9.15.17 -
9.15.17
9.15.17 -
9.15.17
Back to previous page