8.11.17 - Starting off about the middle of the site with the Battle Escape Attraction building.
Starting off about the middle of the site with the Battle Escape Attraction building. 8.11.17
8.11.17 - Panning left.
Panning left. 8.11.17
8.11.17 -
8.11.17
8.11.17 - In the distance the Millennium Falcon attraction building.
In the distance the Millennium Falcon attraction building. 8.11.17
8.11.17 - Moving back across the Battle Escape building you can see work progressing on the roof as well as exterior wall prep
Moving back across the Battle Escape building you can see work progressing on the roof as well as exterior wall prep 8.11.17
8.11.17 -
8.11.17
8.11.17 - On the roof they are preparing to pour concrete on the final portion to finish it off.  The decking looks done.
On the roof they are preparing to pour concrete on the final portion to finish it off. The decking looks done. 8.11.17
8.11.17 - The concrete building on the right has the forms all removed now.
The concrete building on the right has the forms all removed now. 8.11.17
8.11.17 - Asusming these will where steel for the rock structure will be attached.
Asusming these will where steel for the rock structure will be attached. 8.11.17
8.11.17 - Speaking of steel for rock a look to the far side and the rock formations taking shape over the Millennium Falcon building.
Speaking of steel for rock a look to the far side and the rock formations taking shape over the Millennium Falcon building. 8.11.17
8.11.17 -
8.11.17
8.11.17 - Looking beyong the Battle Escape Building you can see steel being attached to the far side for rock.
Looking beyong the Battle Escape Building you can see steel being attached to the far side for rock. 8.11.17
8.11.17 - The hanger area.
The hanger area. 8.11.17
8.11.17 - Rebar is staring to go in to connect the concrete building to the concrete wall on the right.
Rebar is staring to go in to connect the concrete building to the concrete wall on the right. 8.11.17
8.11.17 -
8.11.17
8.11.17 - looking toward the Critter Country entry point.
looking toward the Critter Country entry point. 8.11.17
8.11.17 - The steel structure by the Millennium Falcon building.
The steel structure by the Millennium Falcon building. 8.11.17
8.11.17 -
8.11.17
8.11.17 -
8.11.17
8.11.17 - Millennium Falcon building roof looks to be going on.
Millennium Falcon building roof looks to be going on. 8.11.17
8.11.17 - Moving into the park now the view from the Rivers of America.
Moving into the park now the view from the Rivers of America. 8.11.17
8.11.17 - From this angle you can see the steel structure going in front of the Battle Escape building exterior wall.
From this angle you can see the steel structure going in front of the Battle Escape building exterior wall. 8.11.17
8.11.17 - A closer look
A closer look 8.11.17
8.11.17 - Through the fence along the Big Thunder Trail.
Through the fence along the Big Thunder Trail. 8.11.17
8.11.17 -
8.11.17
8.11.17 -
8.11.17
8.11.17 - From Toontown.
From Toontown. 8.11.17
8.11.17 -
8.11.17
8.11.17 - From the top of the treehouse.
From the top of the treehouse. 8.11.17
8.11.17 -
8.11.17
Back to previous page