8.05.16 - An overview from the Mickey and Friends parking structure
An overview from the Mickey and Friends parking structure 8.05.16
8.05.16 - A pan from the left to right of the site. Notice the mound of dirt is getting smaller.
A pan from the left to right of the site. Notice the mound of dirt is getting smaller. 8.05.16
8.05.16 -
8.05.16
8.05.16 - A construction trailer and a lot of activity in the center of the site.
A construction trailer and a lot of activity in the center of the site. 8.05.16
8.05.16 - More footers and walls taking shape in the middle
More footers and walls taking shape in the middle 8.05.16
8.05.16 -
8.05.16
8.05.16 - Utility work continues on the Critter Country side of the site.
Utility work continues on the Critter Country side of the site. 8.05.16
8.05.16 -
8.05.16
8.05.16 - A wider look at the center area
A wider look at the center area 8.05.16
8.05.16 - More steel i-beams are in and looks like dirt is being brought in front of the new wall.
More steel i-beams are in and looks like dirt is being brought in front of the new wall. 8.05.16
8.05.16 - A closer look
A closer look 8.05.16
8.05.16 - Guessing dirt will go up most the way on the black coating.
Guessing dirt will go up most the way on the black coating. 8.05.16
8.05.16 -
8.05.16
8.05.16 - Dump trucks moving dirt around the site.  Also notice more columns and sections of wall taking shape.
Dump trucks moving dirt around the site. Also notice more columns and sections of wall taking shape. 8.05.16
8.05.16 -
8.05.16
8.05.16 - A concrte pumper was finishing up while I was there.
A concrte pumper was finishing up while I was there. 8.05.16
8.05.16 - More walls taking shape
More walls taking shape 8.05.16
8.05.16 - A footer/foundation for something, guessing the retaining wall for the river.
A footer/foundation for something, guessing the retaining wall for the river. 8.05.16
8.05.16 - Not a lot of visible change here.
Not a lot of visible change here. 8.05.16
8.05.16 - A look at the area closest to the garage.  They are still using some of it as a staging area for utility work as the piping projects continue around the perimeter of the site.
A look at the area closest to the garage. They are still using some of it as a staging area for utility work as the piping projects continue around the perimeter of the site. 8.05.16
8.05.16 - In the center of the area a machine was driving steel beams into the ground.  Could this be the start of work on a show building?  Maybe retaining walls so they can dig a basement?
In the center of the area a machine was driving steel beams into the ground. Could this be the start of work on a show building? Maybe retaining walls so they can dig a basement? 8.05.16
8.05.16 - A closer look.
A closer look. 8.05.16
8.05.16 - A look out on the island.  The dirt level looks about the same as last week.  Right up to the top of the conduit junction/access boxes on the right.
A look out on the island. The dirt level looks about the same as last week. Right up to the top of the conduit junction/access boxes on the right. 8.05.16
8.05.16 - A lot of activity for the foundation of this area.  Wonder if this will be part of the backstage marina for Fantasmic.
A lot of activity for the foundation of this area. Wonder if this will be part of the backstage marina for Fantasmic. 8.05.16
8.05.16 - Dirt being brought in and spread up against the walls by the Big Thunder Trail
Dirt being brought in and spread up against the walls by the Big Thunder Trail 8.05.16
8.05.16 -
8.05.16
8.05.16 - Hard to tell what is going on here.
Hard to tell what is going on here. 8.05.16
8.05.16 - Back to the work in the near lot.
Back to the work in the near lot. 8.05.16
8.05.16 - Earth being moved around on the far side.
Earth being moved around on the far side. 8.05.16
8.05.16 - A wider look at the site
A wider look at the site 8.05.16
8.05.16 - As dirt is moved around they keep reconfiguring the mound.
As dirt is moved around they keep reconfiguring the mound. 8.05.16
8.05.16 - No real visible progress on the strip that stretches out to Critter Country Backstage.
No real visible progress on the strip that stretches out to Critter Country Backstage. 8.05.16
8.05.16 - From the tram route you can see they have created more mounds of dirt, guessing excavation for the pipes that will be filled back in once they are installed.
From the tram route you can see they have created more mounds of dirt, guessing excavation for the pipes that will be filled back in once they are installed. 8.05.16
8.05.16 -
8.05.16
8.05.16 - Approaching the end of the Big Thunder Trail to take a look around.
Approaching the end of the Big Thunder Trail to take a look around. 8.05.16
8.05.16 - Walls beyond the construction fence.
Walls beyond the construction fence. 8.05.16
8.05.16 - A look through the fence does not reveal much visible progress.
A look through the fence does not reveal much visible progress. 8.05.16
8.05.16 -
8.05.16
8.05.16 -
8.05.16
8.05.16 -
8.05.16
8.05.16 - Out on the island renovation work continues.  Here you can see some recently painted rock work and where they are with redoing some of the trees.
Out on the island renovation work continues. Here you can see some recently painted rock work and where they are with redoing some of the trees. 8.05.16
8.05.16 - Moving around to Critter Country the view from near the Canoe dock
Moving around to Critter Country the view from near the Canoe dock 8.05.16
8.05.16 - A pan across the site from right to left (east to west)
A pan across the site from right to left (east to west) 8.05.16
8.05.16 -
8.05.16
8.05.16 - Interesting to note the level and placement of the access points for conduit here.  Assuming that has to stay on dry land and not be under the river that means the river will need to swing further to the right there than it used to.
Interesting to note the level and placement of the access points for conduit here. Assuming that has to stay on dry land and not be under the river that means the river will need to swing further to the right there than it used to. 8.05.16