7.21.17 - The Millennium Falcon show building from the Mickey and Friends Parking Structure
The Millennium Falcon show building from the Mickey and Friends Parking Structure 7.21.17
7.21.17 - Starting on the far left/north side of the site.
Starting on the far left/north side of the site. 7.21.17
7.21.17 - Panning to the right to the Battle Escape show building where the next section of roof is being prepared for concrete.
Panning to the right to the Battle Escape show building where the next section of roof is being prepared for concrete. 7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 - Forms still up on the structure on the far right of the Battle Escape building.
Forms still up on the structure on the far right of the Battle Escape building. 7.21.17
7.21.17 - A large room in the Battle Escape building is receiving insterior steel. It looks to match the hanger bay concept art shown at D23 Expo.
A large room in the Battle Escape building is receiving insterior steel. It looks to match the hanger bay concept art shown at D23 Expo. 7.21.17
7.21.17 - Work continues on the rebar for the second floor of the smaller structure adjacent to the building.
Work continues on the rebar for the second floor of the smaller structure adjacent to the building. 7.21.17
7.21.17 -
7.21.17
7.21.17 - Noticed a fence along the construction site now.  Guess that means the river side is turned over to the park now.
Noticed a fence along the construction site now. Guess that means the river side is turned over to the park now. 7.21.17
7.21.17 - A closer look at the roof.
A closer look at the roof. 7.21.17
7.21.17 - HVAC equipment on the far side.
HVAC equipment on the far side. 7.21.17
7.21.17 - Preparations for the exterior wall span more than half the Battle Escape building now.
Preparations for the exterior wall span more than half the Battle Escape building now. 7.21.17
7.21.17 -
7.21.17
7.21.17 - Preparations underway to pour concrete on more of the second floor.
Preparations underway to pour concrete on more of the second floor. 7.21.17
7.21.17 - More of the support structure for the mountain facade on the Millennium Falcon building.
More of the support structure for the mountain facade on the Millennium Falcon building. 7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 - Digging on the far berm.
Digging on the far berm. 7.21.17
7.21.17 - A train passing over the tresle.  Notice the wall up under the trestle as they prepare to open the rest of the park side walkway.
A train passing over the tresle. Notice the wall up under the trestle as they prepare to open the rest of the park side walkway. 7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 - Moving into the park the walls along the walkway are now down in Critter Country.
Moving into the park the walls along the walkway are now down in Critter Country. 7.21.17
7.21.17 - The Canoe dock looks ready to go.
The Canoe dock looks ready to go. 7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 - The upper level of the Hungry Bear is still blocked off.
The upper level of the Hungry Bear is still blocked off. 7.21.17
7.21.17 -
7.21.17
7.21.17 - The view of the northern shore from Tom Sawyer Island.
The view of the northern shore from Tom Sawyer Island. 7.21.17
7.21.17 -
7.21.17
7.21.17 - Through the trees you can see the doorway open under the trestle.
Through the trees you can see the doorway open under the trestle. 7.21.17
7.21.17 - The eastern side features more rocks and the Indian Village.
The eastern side features more rocks and the Indian Village. 7.21.17
7.21.17 -
7.21.17
7.21.17 - All the scaffolding is gone.  Just one safety rail up by a figure.
All the scaffolding is gone. Just one safety rail up by a figure. 7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 - Looks like the Battle Escape show building is receiving an exterior wall.
Looks like the Battle Escape show building is receiving an exterior wall. 7.21.17
7.21.17 - Looking up river from Critter Country.
Looking up river from Critter Country. 7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
7.21.17 - The next section of the walkway looks ready to open.
The next section of the walkway looks ready to open. 7.21.17
7.21.17 -
7.21.17
7.21.17 - The extended seating at the Hungry Bear is being prepared to reopen.
The extended seating at the Hungry Bear is being prepared to reopen. 7.21.17
7.21.17 -
7.21.17
7.21.17 - On the Big Thunder trail the fence has some holes in it you can look through now.
On the Big Thunder trail the fence has some holes in it you can look through now. 7.21.17
7.21.17 - The walkway here looks ready to open too. Assuming they will be opening this soon so you can walk up to the trestle.
The walkway here looks ready to open too. Assuming they will be opening this soon so you can walk up to the trestle. 7.21.17
7.21.17 -
7.21.17
7.21.17 -
7.21.17
Back to previous page