7.16.16 - Panning across the site starting on the left (north side) and working to the right (south side), the large mound of dirt is still there but smaller each visit now it seems
Panning across the site starting on the left (north side) and working to the right (south side), the large mound of dirt is still there but smaller each visit now it seems 7.16.16
7.16.16 - Between the mound toward Toontown notice more beams onsite.
Between the mound toward Toontown notice more beams onsite. 7.16.16
7.16.16 - These are still waiting installation near the center.  In the background the forms are down from the new wall.  And they are working on drilling holes to the right.
These are still waiting installation near the center. In the background the forms are down from the new wall. And they are working on drilling holes to the right. 7.16.16
7.16.16 - Plenty of forms and retaining walls still in the middle of the site.
Plenty of forms and retaining walls still in the middle of the site. 7.16.16
7.16.16 - The next section of wall has rebar up and is awaiting the forms.
The next section of wall has rebar up and is awaiting the forms. 7.16.16
7.16.16 - Looks like a bridge taking shape in the middle of this picture.
Looks like a bridge taking shape in the middle of this picture. 7.16.16
7.16.16 - The small structure still  has forms to the right in this picture
The small structure still has forms to the right in this picture 7.16.16
7.16.16 - Utility work is still ongoing across the site.
Utility work is still ongoing across the site. 7.16.16
7.16.16 - Near the island are pieces of conduit waiting to be installed
Near the island are pieces of conduit waiting to be installed 7.16.16
7.16.16 -
7.16.16
7.16.16 - The old backstage driveway and gate along the tramway have been removed.
The old backstage driveway and gate along the tramway have been removed. 7.16.16
7.16.16 - This pile of rubble is what is left.
This pile of rubble is what is left. 7.16.16
7.16.16 - Notice how they have leveled off this area.  Guess the pipes and other utilities were installed and now the earth brought back.
Notice how they have leveled off this area. Guess the pipes and other utilities were installed and now the earth brought back. 7.16.16
7.16.16 - Plenty of pipes waiting to be installed still
Plenty of pipes waiting to be installed still 7.16.16
7.16.16 - A closer look at the conduit I mentioned earlier.
A closer look at the conduit I mentioned earlier. 7.16.16
7.16.16 - A trench for some pipe work.
A trench for some pipe work. 7.16.16
7.16.16 - Looks like the interior forms may be gone already.
Looks like the interior forms may be gone already. 7.16.16
7.16.16 - Notice the conduit going into the junction box and more trenches to bring in more pipes.
Notice the conduit going into the junction box and more trenches to bring in more pipes. 7.16.16
7.16.16 - Moving back to the center of the site and the bridge structure taking shape. in the forground and a wall in the background along the Big Thunder trail.
Moving back to the center of the site and the bridge structure taking shape. in the forground and a wall in the background along the Big Thunder trail. 7.16.16
7.16.16 -
7.16.16
7.16.16 - The wall along the Big Thunder Trail (guessing that name will stick around).
The wall along the Big Thunder Trail (guessing that name will stick around). 7.16.16
7.16.16 - A closer look.
A closer look. 7.16.16
7.16.16 - That mound is where the Skyway building once stood.
That mound is where the Skyway building once stood. 7.16.16
7.16.16 - The old backstage (and older train) tunnel.
The old backstage (and older train) tunnel. 7.16.16
7.16.16 - Looks like they are drilling holes in the back. Maybe for the steel beams?
Looks like they are drilling holes in the back. Maybe for the steel beams? 7.16.16
7.16.16 - The new wall
The new wall 7.16.16
7.16.16 - A closer look at the boring machine.
A closer look at the boring machine. 7.16.16
7.16.16 -
7.16.16
7.16.16 -
7.16.16
7.16.16 - Steel i-beams waiting to be installed.  Wonder if these are for the train shed/tunnel/building, the marina, the rockwork or something else... how is that for having no idea :)
Steel i-beams waiting to be installed. Wonder if these are for the train shed/tunnel/building, the marina, the rockwork or something else... how is that for having no idea :) 7.16.16
7.16.16 -
7.16.16
7.16.16 - The new fence along Disneyland Drive looks to be done.
The new fence along Disneyland Drive looks to be done. 7.16.16
7.16.16 - Another look at what looks to be a bridge going in and beyond it a foundation for something.
Another look at what looks to be a bridge going in and beyond it a foundation for something. 7.16.16
7.16.16 - From the tram, they are still working on the new fence along the tramway.
From the tram, they are still working on the new fence along the tramway. 7.16.16
7.16.16 -
7.16.16
7.16.16 -
7.16.16
7.16.16 - From the Fun Wheel you really cannot see much.
From the Fun Wheel you really cannot see much. 7.16.16
7.16.16 - A new piece of concept art is up on the fence across from Big Thunder
A new piece of concept art is up on the fence across from Big Thunder 7.16.16
7.16.16 - Interesting no signage or explanation. Just a piece of art.
Interesting no signage or explanation. Just a piece of art. 7.16.16
7.16.16 -
7.16.16
7.16.16 - The new wall along the Big Thunder trail is visible beyond the construction walls
The new wall along the Big Thunder trail is visible beyond the construction walls 7.16.16
7.16.16 - A look through the fence at the new walls going up.
A look through the fence at the new walls going up. 7.16.16
7.16.16 -
7.16.16
7.16.16 -
7.16.16
7.16.16 - To the left of the Big Thunder trail some plants remain.
To the left of the Big Thunder trail some plants remain. 7.16.16
7.16.16 - On the island more scaffolding and wraps as renovation projects get underway.
On the island more scaffolding and wraps as renovation projects get underway. 7.16.16
7.16.16 - From near the canoe docks in Critter Country.
From near the canoe docks in Critter Country. 7.16.16
7.16.16 - A look across the site from right to left (east to west)
A look across the site from right to left (east to west) 7.16.16
7.16.16 - Conduit waiting to be installed on the right.
Conduit waiting to be installed on the right. 7.16.16
7.16.16 - A hole with conduit and piping connections to the left in this picture.
A hole with conduit and piping connections to the left in this picture. 7.16.16
7.16.16 - Not much happening under the Hungry Bear right now.
Not much happening under the Hungry Bear right now. 7.16.16
7.16.16 - Some work on the roof of the Hungry Bear.
Some work on the roof of the Hungry Bear. 7.16.16