5.25.17 - Starting off with a look at the center of the site from the Mickey and Friends parking structure.
Starting off with a look at the center of the site from the Mickey and Friends parking structure. 5.25.17
5.25.17 - Looking left the larg show building continues to fill out.
Looking left the larg show building continues to fill out. 5.25.17
5.25.17 - To the right not a lot of visible change.
To the right not a lot of visible change. 5.25.17
5.25.17 - Looking closer to the left you can see the Millennium Falcon attraction building
Looking closer to the left you can see the Millennium Falcon attraction building 5.25.17
5.25.17 - Panning to the right the steel for the other attraction (really wish Disney would announce names)
Panning to the right the steel for the other attraction (really wish Disney would announce names) 5.25.17
5.25.17 - More steel going up within the floors to support the ride system and scenes.
More steel going up within the floors to support the ride system and scenes. 5.25.17
5.25.17 - Continuing to pan to the right.
Continuing to pan to the right. 5.25.17
5.25.17 -
5.25.17
5.25.17 - No real visible changes on the far hill or around the entrance tunnels.
No real visible changes on the far hill or around the entrance tunnels. 5.25.17
5.25.17 -
5.25.17
5.25.17 - The crane through the trees is in Frontierland parked at the exit to Big Thunder.
The crane through the trees is in Frontierland parked at the exit to Big Thunder. 5.25.17
5.25.17 - Crews working on the berm in the forest.
Crews working on the berm in the forest. 5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 - Coming back around and a bit closer looks like grading for a new road or pathway is going on through the center of the site.
Coming back around and a bit closer looks like grading for a new road or pathway is going on through the center of the site. 5.25.17
5.25.17 - A single dozer working on the project.  Behind it are large mats/plates that will be placed on the path.
A single dozer working on the project. Behind it are large mats/plates that will be placed on the path. 5.25.17
5.25.17 - Work continues on the wall adjacent to the circular structure.
Work continues on the wall adjacent to the circular structure. 5.25.17
5.25.17 - A wider view.
A wider view. 5.25.17
5.25.17 - Looks like concrete has been poured for the second floor of the circular structure.
Looks like concrete has been poured for the second floor of the circular structure. 5.25.17
5.25.17 - More steel ready to be installed.
More steel ready to be installed. 5.25.17
5.25.17 - A closer look at the Millennium Falcon work.
A closer look at the Millennium Falcon work. 5.25.17
5.25.17 - On the roof some concrete has been poured on the far portion and duct work and other equipment is being installed.
On the roof some concrete has been poured on the far portion and duct work and other equipment is being installed. 5.25.17
5.25.17 - On the second floor wire mesh/rebar is being set up in preparation for the concrete floor.
On the second floor wire mesh/rebar is being set up in preparation for the concrete floor. 5.25.17
5.25.17 - Nothing happening on the ground level yet.
Nothing happening on the ground level yet. 5.25.17
5.25.17 - The new railroad trestle is being installed on the concrete bridge.
The new railroad trestle is being installed on the concrete bridge. 5.25.17
5.25.17 - The backfilled dirt level appears to still be below the railroad level.
The backfilled dirt level appears to still be below the railroad level. 5.25.17
5.25.17 - The AT-ATs are really hard to see through the maze of steel that has been installed.
The AT-ATs are really hard to see through the maze of steel that has been installed. 5.25.17
5.25.17 - Supports for the exterior wall are going in on the second level.
Supports for the exterior wall are going in on the second level. 5.25.17
5.25.17 - A wider view of the Millennium Falcon attraction building in the background.  More steel is going up on the far side.
A wider view of the Millennium Falcon attraction building in the background. More steel is going up on the far side. 5.25.17
5.25.17 - A closer look
A closer look 5.25.17
5.25.17 -
5.25.17
5.25.17 - Back to the first show building.  Looks like wet concrete on a portion of the second floor.
Back to the first show building. Looks like wet concrete on a portion of the second floor. 5.25.17
5.25.17 - The next section being prepped for concrete
The next section being prepped for concrete 5.25.17
5.25.17 - Back to the Millennium Falcon building.
Back to the Millennium Falcon building. 5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 - Crews are lowering what looks to be bolts into the wall structure.  Most likely where steel will attach for the upper floor or roof.
Crews are lowering what looks to be bolts into the wall structure. Most likely where steel will attach for the upper floor or roof. 5.25.17
5.25.17 - A large crane is in Frontierland.
A large crane is in Frontierland. 5.25.17
5.25.17 - It is parked just beyond the Big Thunder exit.  Blocking our view/access to the Big Thunder trail work.
It is parked just beyond the Big Thunder exit. Blocking our view/access to the Big Thunder trail work. 5.25.17
5.25.17 - Looking up river.
Looking up river. 5.25.17
5.25.17 - From Critter Country.
From Critter Country. 5.25.17
5.25.17 - A closer look starting on the left.
A closer look starting on the left. 5.25.17
5.25.17 - The scaffolding toothpick/supports have been removed and the rock is patched and ready to be painted.
The scaffolding toothpick/supports have been removed and the rock is patched and ready to be painted. 5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 -
5.25.17
5.25.17 - Looking through the fence.
Looking through the fence. 5.25.17
5.25.17 -
5.25.17
5.25.17 - The walkway will one day be here.
The walkway will one day be here. 5.25.17
5.25.17 -
5.25.17
5.25.17 - The trestle from the Hungry Bear
The trestle from the Hungry Bear 5.25.17
5.25.17 -
5.25.17
Back to previous page