home > Construction Progress > Star Wars > 12.16.16
12.16.16 - The view from the Mickey and Friends Parking Structure
The view from the Mickey and Friends Parking Structure 12.16.16
12.16.16 - Starting on the left/north side of the site
Starting on the left/north side of the site 12.16.16
12.16.16 - Panning across.
Panning across. 12.16.16
12.16.16 - The tunnel will be the Fantasyland walkway into Star Wars.
The tunnel will be the Fantasyland walkway into Star Wars. 12.16.16
12.16.16 - The tunnel on the right is the one to Frontierland.
The tunnel on the right is the one to Frontierland. 12.16.16
12.16.16 -
12.16.16
12.16.16 - Even though it rained this morning crews were pouring concrete this afternoon.
Even though it rained this morning crews were pouring concrete this afternoon. 12.16.16
12.16.16 - Sticking above the wall are still beams that will support rock work.
Sticking above the wall are still beams that will support rock work. 12.16.16
12.16.16 - Here you can see where they are on the rock work wire mesh installation.
Here you can see where they are on the rock work wire mesh installation. 12.16.16
12.16.16 - On the far side the trees by the Hungry Bear seating have been removed
On the far side the trees by the Hungry Bear seating have been removed 12.16.16
12.16.16 - A closer look toward the far side of the site the wall is being finished.
A closer look toward the far side of the site the wall is being finished. 12.16.16
12.16.16 - A closer look at the Fantasyland tunnel
A closer look at the Fantasyland tunnel 12.16.16
12.16.16 - You can see some rock work sticking up above the dirt.
You can see some rock work sticking up above the dirt. 12.16.16
12.16.16 -
12.16.16
12.16.16 - The Fantasmic backstage marina looks to be enclosed and more concrete structures are taking shape around/above it.
The Fantasmic backstage marina looks to be enclosed and more concrete structures are taking shape around/above it. 12.16.16
12.16.16 -
12.16.16
12.16.16 -
12.16.16
12.16.16 - A closer look at where the train will come out from Critter Country.
A closer look at where the train will come out from Critter Country. 12.16.16
12.16.16 - Hard to see the new walkway taking shape along the Rivers of America with the wall up now.
Hard to see the new walkway taking shape along the Rivers of America with the wall up now. 12.16.16
12.16.16 - More rock formations visible over the top of the wall.
More rock formations visible over the top of the wall. 12.16.16
12.16.16 -
12.16.16
12.16.16 -
12.16.16
12.16.16 - Looks like concrete has been applied to the rock surface in one area near the trestle
Looks like concrete has been applied to the rock surface in one area near the trestle 12.16.16
12.16.16 - In the near lot foundation work for a massive show building continues.
In the near lot foundation work for a massive show building continues. 12.16.16
12.16.16 - A closer look at the bridge for the train.
A closer look at the bridge for the train. 12.16.16
12.16.16 -
12.16.16
12.16.16 - A closer look at foundation work and footers for the show building.
A closer look at foundation work and footers for the show building. 12.16.16
12.16.16 -
12.16.16
12.16.16 -
12.16.16
12.16.16 - From ground level you really cannot see much from the tramway.
From ground level you really cannot see much from the tramway. 12.16.16
12.16.16 - From in the park at the end of the Big Thunder Trail.
From in the park at the end of the Big Thunder Trail. 12.16.16
12.16.16 -
12.16.16
12.16.16 - Looking through the fence.  Looks like a temporary walkway is set up along the Big Thunder Trail.
Looking through the fence. Looks like a temporary walkway is set up along the Big Thunder Trail. 12.16.16
12.16.16 -
12.16.16
12.16.16 - A better look at the walkway.  Wonder if this is for overflow crowds during the holidays if needed.
A better look at the walkway. Wonder if this is for overflow crowds during the holidays if needed. 12.16.16
12.16.16 -
12.16.16
12.16.16 - Moving over to Critter Country.
Moving over to Critter Country. 12.16.16
12.16.16 - Looking through the fence at the rock formations taking shape.
Looking through the fence at the rock formations taking shape. 12.16.16
12.16.16 - They are not refilling river yet, that water is from the morning rain.
They are not refilling river yet, that water is from the morning rain. 12.16.16
12.16.16 -
12.16.16
12.16.16 - Some new trees waiting to go in.
Some new trees waiting to go in. 12.16.16
12.16.16 -
12.16.16
12.16.16 - Looking down the path of the new walkway.
Looking down the path of the new walkway. 12.16.16
12.16.16 - A closer look at the rock work taking shape.
A closer look at the rock work taking shape. 12.16.16
12.16.16 - Walls continuing to take shape.
Walls continuing to take shape. 12.16.16
12.16.16 -
12.16.16
12.16.16 -
12.16.16
12.16.16 - On the far right more i-beams/toothpicks waiting for the steel mesh to be installed.
On the far right more i-beams/toothpicks waiting for the steel mesh to be installed. 12.16.16
Back to previous page