11.17.17 - An overview from the Mickey and Friends Parking Structure
An overview from the Mickey and Friends Parking Structure 11.17.17
11.17.17 - Looking toward the Millennium Falcon building.
Looking toward the Millennium Falcon building. 11.17.17
11.17.17 - Not a lot of visible change on the exterior stairs.
Not a lot of visible change on the exterior stairs. 11.17.17
11.17.17 - The exterior panel installation has moved to the last side of the building now. The Disneyland Drive side is complete.
The exterior panel installation has moved to the last side of the building now. The Disneyland Drive side is complete. 11.17.17
11.17.17 -
11.17.17
11.17.17 - No visible progress on the concrete building.
No visible progress on the concrete building. 11.17.17
11.17.17 - Conduit and electrical work underway in the area behind and between the buildings.
Conduit and electrical work underway in the area behind and between the buildings. 11.17.17
11.17.17 -
11.17.17
11.17.17 - Looks to be a service entrance or at least a hole left in the building for construction access.
Looks to be a service entrance or at least a hole left in the building for construction access. 11.17.17
11.17.17 - Inside the concrete floor is now poured.
Inside the concrete floor is now poured. 11.17.17
11.17.17 - More HVAC work on the roof.
More HVAC work on the roof. 11.17.17
11.17.17 - No real visible change on the steel support structures.
No real visible change on the steel support structures. 11.17.17
11.17.17 - The siding on the roof structures is cut now.
The siding on the roof structures is cut now. 11.17.17
11.17.17 -
11.17.17
11.17.17 - A closer look at the temporary platform on the back side.
A closer look at the temporary platform on the back side. 11.17.17
11.17.17 -
11.17.17
11.17.17 - Forms continuing to take shape on the walkway to Critter Country.
Forms continuing to take shape on the walkway to Critter Country. 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 - More wire mesh being added to the steel supports on the park side
More wire mesh being added to the steel supports on the park side 11.17.17
11.17.17 - The Mellennium Falcon show building.
The Mellennium Falcon show building. 11.17.17
11.17.17 - A closer look at the rock formations.  They are receiving the first layer of concrete.
A closer look at the rock formations. They are receiving the first layer of concrete. 11.17.17
11.17.17 -
11.17.17
11.17.17 - The shorter one on the right has had concrete applied.
The shorter one on the right has had concrete applied. 11.17.17
11.17.17 - They were working on the one on the left.
They were working on the one on the left. 11.17.17
11.17.17 - A section of the Millennium Falcon exterior is still off.
A section of the Millennium Falcon exterior is still off. 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 - The reverse view from Toontown.
The reverse view from Toontown. 11.17.17
11.17.17 - A closer look.
A closer look. 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 - This week you could get a look through one crack in the fence from the Big Thunder Trail.
This week you could get a look through one crack in the fence from the Big Thunder Trail. 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 - From the Mark Twain you can see a mound of dirt beyond the new trestle in Critter Country.
From the Mark Twain you can see a mound of dirt beyond the new trestle in Critter Country. 11.17.17
11.17.17 - The steel supports awaiting wire mesh on the park side of the Battle Escape Building.
The steel supports awaiting wire mesh on the park side of the Battle Escape Building. 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 - Wire mesh being installed on this portion to form the rock formations.
Wire mesh being installed on this portion to form the rock formations. 11.17.17
11.17.17 - The three peaks from the Mark Twain.
The three peaks from the Mark Twain. 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 - Another section that has wire mesh and the scaffolding in place.
Another section that has wire mesh and the scaffolding in place. 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 - A better view of the wire mesh
A better view of the wire mesh 11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17
11.17.17 -
11.17.17