11.10.17 - Looking out at the Star Wars: Galaxy's Edge Construction site from the Mickey and Friends Parking Structure.
Looking out at the Star Wars: Galaxy's Edge Construction site from the Mickey and Friends Parking Structure. 11.10.17
11.10.17 - Panning to the left.
Panning to the left. 11.10.17
11.10.17 - Starting on the far left/north side with the Millennium Falcon show building.
Starting on the far left/north side with the Millennium Falcon show building. 11.10.17
11.10.17 - The mountains towering over the buildings.
The mountains towering over the buildings. 11.10.17
11.10.17 - Continuing to the right the Battle Escape show building.
Continuing to the right the Battle Escape show building. 11.10.17
11.10.17 -
11.10.17
11.10.17 -
11.10.17
11.10.17 - The exterior wall is now up on almost the entire side facing Disneyland Drive.
The exterior wall is now up on almost the entire side facing Disneyland Drive. 11.10.17
11.10.17 - No real visible progress with the concrete building.
No real visible progress with the concrete building. 11.10.17
11.10.17 - Back to the Millennium Falcon show building.
Back to the Millennium Falcon show building. 11.10.17
11.10.17 - The side is still open, all the equipment that was staged on the ground has been lifted into place.
The side is still open, all the equipment that was staged on the ground has been lifted into place. 11.10.17
11.10.17 - Here you can see some of it on the roof.
Here you can see some of it on the roof. 11.10.17
11.10.17 -
11.10.17
11.10.17 - A closer look at the mountains.
A closer look at the mountains. 11.10.17
11.10.17 -
11.10.17
11.10.17 -
11.10.17
11.10.17 -
11.10.17
11.10.17 - Panning to the right the steel support structure for the rock work on the park side of the Battle Escape show building.
Panning to the right the steel support structure for the rock work on the park side of the Battle Escape show building. 11.10.17
11.10.17 -
11.10.17
11.10.17 - This is the side of the Battle Escape Building, you can see the exterior panneling that was installed.
This is the side of the Battle Escape Building, you can see the exterior panneling that was installed. 11.10.17
11.10.17 - The forms are still up for the walls toward Critter Country.
The forms are still up for the walls toward Critter Country. 11.10.17
11.10.17 -
11.10.17
11.10.17 -
11.10.17
11.10.17 - It appears concrete has been poured.
It appears concrete has been poured. 11.10.17
11.10.17 - A temporary platform has been constructed by the service bay on the Battle Escape Building.
A temporary platform has been constructed by the service bay on the Battle Escape Building. 11.10.17
11.10.17 -
11.10.17
11.10.17 - Inside the hanger bay portion of the Battle Escape building concrete is poured on the left most section.
Inside the hanger bay portion of the Battle Escape building concrete is poured on the left most section. 11.10.17
11.10.17 - The floor that is poured now.
The floor that is poured now. 11.10.17
11.10.17 - The next section looks ready to go.
The next section looks ready to go. 11.10.17
11.10.17 -
11.10.17
11.10.17 - From the Tree House.
From the Tree House. 11.10.17
11.10.17 - From Critter Country.
From Critter Country. 11.10.17