2.21.22 - This visit teams continued to work on the hills by applying a texture coating to portions of them.
This visit teams continued to work on the hills by applying a texture coating to portions of them. 2.21.22
2.21.22 - The view as you enter Toontown, the first half of the building has panels installed
The view as you enter Toontown, the first half of the building has panels installed 2.21.22
2.21.22 - A closer look at the El Capitoon.  Scaffolding is going up.
A closer look at the El Capitoon. Scaffolding is going up. 2.21.22
2.21.22 - A closer look at the hill support structure.
A closer look at the hill support structure. 2.21.22
2.21.22 - As you pan to the left you can see various stages of work.
As you pan to the left you can see various stages of work. 2.21.22
2.21.22 - A closer look.  You can see the ridgeline from the front set to the ones on the roof.
A closer look. You can see the ridgeline from the front set to the ones on the roof. 2.21.22
2.21.22 - Back to the El Capitoon
Back to the El Capitoon 2.21.22
2.21.22 - These brackets have been attached
These brackets have been attached 2.21.22
2.21.22 -
2.21.22
2.21.22 -
2.21.22
2.21.22 - The former Gag Factory entrance has scaffolding up now.
The former Gag Factory entrance has scaffolding up now. 2.21.22
2.21.22 - More scaffolding.
More scaffolding. 2.21.22
2.21.22 - Crews were on lifts behind Minnie's house working on the hills.
Crews were on lifts behind Minnie's house working on the hills. 2.21.22
2.21.22 - Another look at the El Capitoon
Another look at the El Capitoon 2.21.22
2.21.22 -
2.21.22
2.21.22 -
2.21.22
2.21.22 - More framing for walls is up inside.
More framing for walls is up inside. 2.21.22
2.21.22 - Back to the hills.
Back to the hills. 2.21.22
2.21.22 - Panning left you can see how the panels of sheetrock (or whatever it is) are are sealed then covered.
Panning left you can see how the panels of sheetrock (or whatever it is) are are sealed then covered. 2.21.22
2.21.22 -
2.21.22
2.21.22 - A closer look at the team applying a coating to the hills.
A closer look at the team applying a coating to the hills. 2.21.22
2.21.22 - A wider view.
A wider view. 2.21.22
2.21.22 -
2.21.22
2.21.22 - A second that this step has been completed on.
A second that this step has been completed on. 2.21.22
2.21.22 - Interesting the panels stop before the bottom with more steel supports below.
Interesting the panels stop before the bottom with more steel supports below. 2.21.22
2.21.22 -
2.21.22
2.21.22 - A worker on the roof.
A worker on the roof. 2.21.22
Back to previous page