4.09.10 - Work contiues in the River.  Most of the track is now replaced
Work contiues in the River. Most of the track is now replaced 4.09.10
4.09.10 - The new Keel boat
The new Keel boat 4.09.10
4.09.10 -
4.09.10
4.09.10 - The tree work is rolling along
The tree work is rolling along 4.09.10
4.09.10 -
4.09.10
4.09.10 - Concrete being poured along the far bank
Concrete being poured along the far bank 4.09.10
4.09.10 - The new TSI dock is taking shape
The new TSI dock is taking shape 4.09.10
4.09.10 -
4.09.10
4.09.10 -
4.09.10
4.09.10 - The Fantasmic equipment was covered this trip.
The Fantasmic equipment was covered this trip. 4.09.10
4.09.10 -
4.09.10
4.09.10 - The track is in along the front area now
The track is in along the front area now 4.09.10
4.09.10 - A large fan on the stage.
A large fan on the stage. 4.09.10
4.09.10 - A better shot of the new dock
A better shot of the new dock 4.09.10
4.09.10 - The canoe dock has been poured too.
The canoe dock has been poured too. 4.09.10
4.09.10 -
4.09.10
4.09.10 - The painting looks to be done on the Columbia and the scaffolding is all down.
The painting looks to be done on the Columbia and the scaffolding is all down. 4.09.10
4.09.10 -
4.09.10
4.09.10 - This area looks to be moving along
This area looks to be moving along 4.09.10
4.09.10 - The docks on the other side have forms and rebar and look to be ready to pour soon.
The docks on the other side have forms and rebar and look to be ready to pour soon. 4.09.10
4.09.10 - More rebar for the docks
More rebar for the docks 4.09.10
4.09.10 -
4.09.10
4.09.10 - Looks like the mechanism for the water wheel is being rebuilt.
Looks like the mechanism for the water wheel is being rebuilt. 4.09.10
4.09.10 -
4.09.10
4.09.10 - From the Tree House you can see they still have more track to replace near the switch.
From the Tree House you can see they still have more track to replace near the switch. 4.09.10
4.09.10 - No paddle wheel on the Mark Twain yet.
No paddle wheel on the Mark Twain yet. 4.09.10
4.09.10 -
4.09.10
4.09.10 - The dock and smoking area are being rebuilt.
The dock and smoking area are being rebuilt. 4.09.10
4.09.10 -
4.09.10
4.09.10 -
4.09.10
4.09.10 -
4.09.10
4.09.10 -
4.09.10
4.09.10 -
4.09.10
Back to previous page