12.23.10 - The tarps and scaffolding are back up on the side facing the bathrooms
The tarps and scaffolding are back up on the side facing the bathrooms 12.23.10
12.23.10 -
12.23.10
12.23.10 - Walking around front.
Walking around front. 12.23.10
12.23.10 -
12.23.10
12.23.10 -
12.23.10
12.23.10 - From the Fun Wheel
From the Fun Wheel 12.23.10
12.23.10 - More pieces on the roof waiting to be installed to add detail to the exterior
More pieces on the roof waiting to be installed to add detail to the exterior 12.23.10
12.23.10 -
12.23.10
12.23.10 - The steel archway/walkway is takinging shape.  Assuming this is for the queue.
The steel archway/walkway is takinging shape. Assuming this is for the queue. 12.23.10
12.23.10 - From ground level
From ground level 12.23.10
12.23.10 -
12.23.10
12.23.10 -
12.23.10
12.23.10 -
12.23.10
12.23.10 - You really cannot tell much through the tarp.
You really cannot tell much through the tarp. 12.23.10
Back to previous page