02.12.11 - A new window has been installed in the hole facing the Bay Area restrooms
A new window has been installed in the hole facing the Bay Area restrooms 02.12.11
02.12.11 - Walking around front.
Walking around front. 02.12.11
02.12.11 - The exterior walls are going up and details are starting to emerge
The exterior walls are going up and details are starting to emerge 02.12.11
02.12.11 -
02.12.11
02.12.11 - Prep work for the new sign is moving along.
Prep work for the new sign is moving along. 02.12.11
02.12.11 -
02.12.11
02.12.11 - From the Fun Wheel
From the Fun Wheel 02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 - More pieces awaiting installation are sitting on the roof.
More pieces awaiting installation are sitting on the roof. 02.12.11
02.12.11 -
02.12.11
02.12.11 - Also in crates on the ground are things to be installed on the exterior
Also in crates on the ground are things to be installed on the exterior 02.12.11
02.12.11 - From ground level
From ground level 02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 - Through the tarp you can see a shell
Through the tarp you can see a shell 02.12.11
02.12.11 -
02.12.11
02.12.11 - From the Zephyr
From the Zephyr 02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 -
02.12.11
02.12.11 - More shells.
More shells. 02.12.11
02.12.11 -
02.12.11
02.12.11 - To close another look at the new window.
To close another look at the new window. 02.12.11