12.20.19 - Most of the exterior of the new elevator shaft is now covered as well as the metal mesh installed on the stairs and walkway.
Most of the exterior of the new elevator shaft is now covered as well as the metal mesh installed on the stairs and walkway. 12.20.19
12.20.19 - Just some sections to finish up near the first floor doors on this side.
Just some sections to finish up near the first floor doors on this side. 12.20.19
12.20.19 -
12.20.19
12.20.19 -
12.20.19
12.20.19 -
12.20.19
12.20.19 - The view from ground level.
The view from ground level. 12.20.19
12.20.19 -
12.20.19
12.20.19 -
12.20.19
12.20.19 -
12.20.19
12.20.19 -
12.20.19
12.20.19 - The 4th floor elevator work.
The 4th floor elevator work. 12.20.19
12.20.19 -
12.20.19
Back to previous page