12.20.18 - Looking toward the back of the new structure, it has reached the 5th floor on the nearest sections.
Looking toward the back of the new structure, it has reached the 5th floor on the nearest sections. 12.20.18
12.20.18 - They were pouring the next section of the 5th floor this afternoon.
They were pouring the next section of the 5th floor this afternoon. 12.20.18
12.20.18 - A closer look at the crews working with the concrete.
A closer look at the crews working with the concrete. 12.20.18
12.20.18 -
12.20.18
12.20.18 -
12.20.18
12.20.18 - The 6th floor/roof level forms are going up on the section closest to the tram stop & Mickey & Friends garage.
The 6th floor/roof level forms are going up on the section closest to the tram stop & Mickey & Friends garage. 12.20.18
12.20.18 -
12.20.18
12.20.18 - The forms are up to complete the ramp and conncetion spans.  They were installing rebar on Friday.
The forms are up to complete the ramp and conncetion spans. They were installing rebar on Friday. 12.20.18
12.20.18 - A closer look.
A closer look. 12.20.18
12.20.18 -
12.20.18
12.20.18 - More escalators have been installed and more are being prepared to install.
More escalators have been installed and more are being prepared to install. 12.20.18
12.20.18 - On the ground they were preparing the next units to be installed.
On the ground they were preparing the next units to be installed. 12.20.18
12.20.18 - The escalators from the 3rd to 4th and 5th to 6th floors have been installed.
The escalators from the 3rd to 4th and 5th to 6th floors have been installed. 12.20.18
12.20.18 - The side facing the tram stop.
The side facing the tram stop. 12.20.18
12.20.18 -
12.20.18
12.20.18 - A closer look at the escalator structure
A closer look at the escalator structure 12.20.18
12.20.18 - Here is a closer look at the one from the 5th to 6th floors.
Here is a closer look at the one from the 5th to 6th floors. 12.20.18
12.20.18 - A closer look at the one from the 3rd to 4th floors
A closer look at the one from the 3rd to 4th floors 12.20.18
12.20.18 - Assembling the pieces for the larger ones that will be installed soon.
Assembling the pieces for the larger ones that will be installed soon. 12.20.18
12.20.18 - Crews painting/sealing the side of the structure facing the tram stop.
Crews painting/sealing the side of the structure facing the tram stop. 12.20.18
12.20.18 - In the background crews working on what appears to be another elevator structure on the back side.
In the background crews working on what appears to be another elevator structure on the back side. 12.20.18
12.20.18 - The connection spans from the escalator.
The connection spans from the escalator. 12.20.18
12.20.18 - Looking into the ground level concrete has not been poured in some areas and notice the raised strip just inside the support columns.
Looking into the ground level concrete has not been poured in some areas and notice the raised strip just inside the support columns. 12.20.18
12.20.18 - From ground level.
From ground level. 12.20.18
12.20.18 - On Magic Way looking up at the escalator structure, no signs of the new bridge yet.
On Magic Way looking up at the escalator structure, no signs of the new bridge yet. 12.20.18
12.20.18 -
12.20.18
12.20.18 -
12.20.18
12.20.18 - From the Pixar Pal-A-Round you can see the 5th floor concrete pour.
From the Pixar Pal-A-Round you can see the 5th floor concrete pour. 12.20.18
12.20.18 - Panning to the right across the structure.
Panning to the right across the structure. 12.20.18
12.20.18 -
12.20.18