12.14.18 - Looking toward the front of the new garage from the 4th floor of Mickey and Friends.  You can see the connection span and ramp forms for the 6th floor are now up.
Looking toward the front of the new garage from the 4th floor of Mickey and Friends. You can see the connection span and ramp forms for the 6th floor are now up. 12.14.18
12.14.18 - Panning to the right you can see they have painted/sealed most of the concrete on this face.
Panning to the right you can see they have painted/sealed most of the concrete on this face. 12.14.18
12.14.18 - The building on the first floor looks to be complete now.
The building on the first floor looks to be complete now. 12.14.18
12.14.18 -
12.14.18
12.14.18 -
12.14.18
12.14.18 - A closer look at some recently poured concrete on the first floor.
A closer look at some recently poured concrete on the first floor. 12.14.18
12.14.18 -
12.14.18
12.14.18 - You can see supports for the 6th floor forms are rising up on the near section.
You can see supports for the 6th floor forms are rising up on the near section. 12.14.18
12.14.18 -
12.14.18
12.14.18 - A closer look at the forms for the ramp and connection span for the roof/6th floor.
A closer look at the forms for the ramp and connection span for the roof/6th floor. 12.14.18
12.14.18 - The side facing the tram stop.
The side facing the tram stop. 12.14.18
12.14.18 - Escalator installation is well underway with the support structures in place and the two for the second floor installed.
Escalator installation is well underway with the support structures in place and the two for the second floor installed. 12.14.18
12.14.18 - They are enclosing the elevator structure.
They are enclosing the elevator structure. 12.14.18
12.14.18 - A closer look at the escalators.
A closer look at the escalators. 12.14.18
12.14.18 - The support sturctures for the other two are installed.
The support sturctures for the other two are installed. 12.14.18
12.14.18 -
12.14.18
12.14.18 - A closer look at the elevator structure.
A closer look at the elevator structure. 12.14.18
12.14.18 - A closer look at where the 5th floor escalator will connect.
A closer look at where the 5th floor escalator will connect. 12.14.18
12.14.18 - Where the 3rd floor escalator will connect.
Where the 3rd floor escalator will connect. 12.14.18
12.14.18 - The second floor escalators.
The second floor escalators. 12.14.18
12.14.18 -
12.14.18
12.14.18 - You can see the support structure for the 5th to 6th floor escalator taking shape.
You can see the support structure for the 5th to 6th floor escalator taking shape. 12.14.18
12.14.18 - In the foreground the escalator supports for the 5th/6th floor connection.  Beyond it not sure what that is on the back side, maybe another set of elevators?
In the foreground the escalator supports for the 5th/6th floor connection. Beyond it not sure what that is on the back side, maybe another set of elevators? 12.14.18
12.14.18 - Panning across the garage you can see can see the various stages of completeness.
Panning across the garage you can see can see the various stages of completeness. 12.14.18
12.14.18 -
12.14.18
12.14.18 - Teams working on the 5th floor
Teams working on the 5th floor 12.14.18
12.14.18 -
12.14.18
12.14.18 -
12.14.18
12.14.18 - From the escalator you can see all the connection spans now.
From the escalator you can see all the connection spans now. 12.14.18
12.14.18 - From ground level.
From ground level. 12.14.18
12.14.18 - From the Pixar Pal-A-Round.
From the Pixar Pal-A-Round. 12.14.18
12.14.18 -
12.14.18
12.14.18 - Crews pouring concrete for a section of the structure on the back side.
Crews pouring concrete for a section of the structure on the back side. 12.14.18
12.14.18 -
12.14.18
12.14.18 -
12.14.18
12.14.18 -
12.14.18
Back to previous page