12.01.18 - A look at the status from this visit.
A look at the status from this visit. 12.01.18
12.01.18 - The building on the ground level has a roof now.
The building on the ground level has a roof now. 12.01.18
12.01.18 - The 5th floor is taking shape on the back section.
The 5th floor is taking shape on the back section. 12.01.18
12.01.18 -
12.01.18
12.01.18 -
12.01.18
12.01.18 - From near the elevators.
From near the elevators. 12.01.18
12.01.18 - Painting/sealing the escalator structure for the new garage is underway.
Painting/sealing the escalator structure for the new garage is underway. 12.01.18
12.01.18 - A closer look.  The frame for the lowest escalator is taking shape and supports for the canopy.
A closer look. The frame for the lowest escalator is taking shape and supports for the canopy. 12.01.18
12.01.18 -
12.01.18
12.01.18 - Scaffolding around the steel structure, assuming this will be the elevators.
Scaffolding around the steel structure, assuming this will be the elevators. 12.01.18
12.01.18 -
12.01.18
12.01.18 - From the escalator
From the escalator 12.01.18
12.01.18 - From ground level
From ground level 12.01.18
12.01.18 -
12.01.18
12.01.18 - Looks to be another canopy support and framing for an escalator on the top floor.
Looks to be another canopy support and framing for an escalator on the top floor. 12.01.18
12.01.18 - A closer look at the various stages of work on the concrete.
A closer look at the various stages of work on the concrete. 12.01.18
12.01.18 - From Magic Way.
From Magic Way. 12.01.18
12.01.18 - No signs of work across the street where the bridge will span.
No signs of work across the street where the bridge will span. 12.01.18
12.01.18 -
12.01.18
12.01.18 - To close the view from the Pixar Pal-A-Round.
To close the view from the Pixar Pal-A-Round. 12.01.18
12.01.18 -
12.01.18
Back to previous page