11.20.18 - The road bed for the 5th floor connection to the Mickey and Friends parking structure has been poured.  Rebar is ready for the walls and support columns.
The road bed for the 5th floor connection to the Mickey and Friends parking structure has been poured. Rebar is ready for the walls and support columns. 11.20.18
11.20.18 - Looking out across the 5th floor of the new structure.
Looking out across the 5th floor of the new structure. 11.20.18
11.20.18 -
11.20.18
11.20.18 - Below the ramps a structure continues to take shape.
Below the ramps a structure continues to take shape. 11.20.18
11.20.18 - The back portion of the garage has support columns visible for the 5th floor.
The back portion of the garage has support columns visible for the 5th floor. 11.20.18
11.20.18 -
11.20.18
11.20.18 - Here you can see a team working on a section of the 5th floor.
Here you can see a team working on a section of the 5th floor. 11.20.18
11.20.18 -
11.20.18
11.20.18 - Looking toward the escalator structure.
Looking toward the escalator structure. 11.20.18
11.20.18 - A closer look.  You can see scaffolding is being constructed around the steel structure.  Will that be for elevators?
A closer look. You can see scaffolding is being constructed around the steel structure. Will that be for elevators? 11.20.18
11.20.18 - Looks like stairs will evenutally go in near the connection bridge.
Looks like stairs will evenutally go in near the connection bridge. 11.20.18
11.20.18 -
11.20.18
11.20.18 - On the left side notice they are painting/sealing the concrete.  There is a different color/texture on some of it now.
On the left side notice they are painting/sealing the concrete. There is a different color/texture on some of it now. 11.20.18
11.20.18 -
11.20.18
11.20.18 -
11.20.18
11.20.18 - A closer look at where the escalators will be installed at some point.
A closer look at where the escalators will be installed at some point. 11.20.18
11.20.18 -
11.20.18
11.20.18 - A look at the connection span from the escalators.
A look at the connection span from the escalators. 11.20.18