11.02.18 - An overview of the site this week.
An overview of the site this week. 11.02.18
11.02.18 - Most of the supports and scaffolding are removed from the escalator structure now and the supports for the escalators appear done.
Most of the supports and scaffolding are removed from the escalator structure now and the supports for the escalators appear done. 11.02.18
11.02.18 - A closer look at one of the supports.
A closer look at one of the supports. 11.02.18
11.02.18 - In the background notice the pit.  Wonder if that will be for Elevators.
In the background notice the pit. Wonder if that will be for Elevators. 11.02.18
11.02.18 - Here you can see supports on the 5th floor for the roof structure rising up.
Here you can see supports on the 5th floor for the roof structure rising up. 11.02.18
11.02.18 - A look at the left two escalator supports and footers.
A look at the left two escalator supports and footers. 11.02.18
11.02.18 -
11.02.18
11.02.18 - Steel rising above the concrete now.  Guessing for the facade.
Steel rising above the concrete now. Guessing for the facade. 11.02.18
11.02.18 - Concrete was being poured into forms on the 5th floor this afternoon.
Concrete was being poured into forms on the 5th floor this afternoon. 11.02.18
11.02.18 - Now a pan across the project.
Now a pan across the project. 11.02.18
11.02.18 -
11.02.18
11.02.18 -
11.02.18
11.02.18 -
11.02.18
11.02.18 -
11.02.18
11.02.18 - Here you can see the forms for the 5th floor connection between the strutures.
Here you can see the forms for the 5th floor connection between the strutures. 11.02.18
11.02.18 - From above the forms are awaiting rebar for the roadbed.
From above the forms are awaiting rebar for the roadbed. 11.02.18
11.02.18 - Looking down below it appears a roof or floor supports have been added to the cinderblock structure under the ramp.  It appears the wall will continue up so thinking those are for a second floor.
Looking down below it appears a roof or floor supports have been added to the cinderblock structure under the ramp. It appears the wall will continue up so thinking those are for a second floor. 11.02.18
11.02.18 - Concrete being pumped to forms for the 5th floor support columns.
Concrete being pumped to forms for the 5th floor support columns. 11.02.18
11.02.18 -
11.02.18
11.02.18 - A closer look at the concrete work on the escalator structure today.
A closer look at the concrete work on the escalator structure today. 11.02.18
11.02.18 - From the escalator.
From the escalator. 11.02.18
11.02.18 - From ground level.
From ground level. 11.02.18
11.02.18 -
11.02.18
11.02.18 -
11.02.18