11.01.19 - The final sections of pavers are going in.  Today the two sets of escalators for the lower levels were blocked off.
The final sections of pavers are going in. Today the two sets of escalators for the lower levels were blocked off. 11.01.19
11.01.19 - A new icon/statue for the structure will be added in this planter.
A new icon/statue for the structure will be added in this planter. 11.01.19
11.01.19 - A closer look.
A closer look. 11.01.19
11.01.19 - Adding sand to lock in the pavers.
Adding sand to lock in the pavers. 11.01.19
11.01.19 - The new elevator shaft is still awaiting its exterior panels.
The new elevator shaft is still awaiting its exterior panels. 11.01.19
11.01.19 - A wider look at the new elevator shaft.
A wider look at the new elevator shaft. 11.01.19
11.01.19 - Supports added for metal mesh to be added to the structure and stair case.
Supports added for metal mesh to be added to the structure and stair case. 11.01.19
11.01.19 -
11.01.19
11.01.19 -
11.01.19
11.01.19 - From ground level.
From ground level. 11.01.19
11.01.19 -
11.01.19
11.01.19 -
11.01.19
11.01.19 -
11.01.19
11.01.19 -
11.01.19
11.01.19 - They have started to add the metal mesh above the restrooms.
They have started to add the metal mesh above the restrooms. 11.01.19
11.01.19 -
11.01.19
11.01.19 - A closer look in the evening.
A closer look in the evening. 11.01.19
11.01.19 - A final look for today as I road the escalator up.
A final look for today as I road the escalator up. 11.01.19