10.05.18 - Fences up on the Daisy level where the bridge to the new garage will connect
Fences up on the Daisy level where the bridge to the new garage will connect 10.05.18
10.05.18 - The new garage bridge has a walled off pedestrian portion it appears.
The new garage bridge has a walled off pedestrian portion it appears. 10.05.18
10.05.18 - Looking toward the escalator structure beyond the tram stop area.
Looking toward the escalator structure beyond the tram stop area. 10.05.18
10.05.18 - Supports for the 4th floor have started to go up.
Supports for the 4th floor have started to go up. 10.05.18
10.05.18 - Here you can see the lower ramps connection to the fourth floor taking shape.
Here you can see the lower ramps connection to the fourth floor taking shape. 10.05.18
10.05.18 - A wider view of the ramp structure.
A wider view of the ramp structure. 10.05.18
10.05.18 - In the distance the bridge connecting the back portion of the two garages.
In the distance the bridge connecting the back portion of the two garages. 10.05.18
10.05.18 - Survey equipment on the roof.
Survey equipment on the roof. 10.05.18
10.05.18 -
10.05.18
10.05.18 -
10.05.18
10.05.18 - A closer look at the connection to the 3rd floor for the lower ramp.
A closer look at the connection to the 3rd floor for the lower ramp. 10.05.18
10.05.18 - Further down the ramp the second floor connection.
Further down the ramp the second floor connection. 10.05.18
10.05.18 - Looking out across the structure you can see various stages of levels going in.
Looking out across the structure you can see various stages of levels going in. 10.05.18
10.05.18 - A closer look at the escalator structure.  Today they were pouring foundations for the escalators.
A closer look at the escalator structure. Today they were pouring foundations for the escalators. 10.05.18
10.05.18 -
10.05.18
10.05.18 - The structure has reached the 6th floor
The structure has reached the 6th floor 10.05.18
10.05.18 - It appears the second floor is done all the way to Magic Way
It appears the second floor is done all the way to Magic Way 10.05.18
10.05.18 -
10.05.18
10.05.18 - A different angle at the near set of spans connecting the two structures.
A different angle at the near set of spans connecting the two structures. 10.05.18
10.05.18 -
10.05.18
10.05.18 -
10.05.18
10.05.18 - A closer look at the concrete pour.
A closer look at the concrete pour. 10.05.18
10.05.18 -
10.05.18
10.05.18 -
10.05.18
10.05.18 -
10.05.18
10.05.18 - On the roof forms waiting to be set up for columns to support the roof structure.
On the roof forms waiting to be set up for columns to support the roof structure. 10.05.18
10.05.18 -
10.05.18
10.05.18 -
10.05.18
10.05.18 - From the escalator.
From the escalator. 10.05.18
10.05.18 - From ground level.
From ground level. 10.05.18
10.05.18 -
10.05.18
10.05.18 - From the Pixar Pal-A-Round you can see the structure rising above the trees
From the Pixar Pal-A-Round you can see the structure rising above the trees 10.05.18