09.13.19 - Starting off today on the 4th floor of the Mickey and Friends parking structure checking out the new elevator shaft.
Starting off today on the 4th floor of the Mickey and Friends parking structure checking out the new elevator shaft. 09.13.19
09.13.19 - The walls have been moved and are around the area in front of the elevators as the temporary walkway is removed and final trees and pavers are finished.
The walls have been moved and are around the area in front of the elevators as the temporary walkway is removed and final trees and pavers are finished. 09.13.19
09.13.19 - The large center section of the new plaza opened this morning.
The large center section of the new plaza opened this morning. 09.13.19
09.13.19 - On the left side a small area is still being worked on. This is where the sculpture for this structure will go plus soe more pavers (this was the construction entrance/exit area.
On the left side a small area is still being worked on. This is where the sculpture for this structure will go plus soe more pavers (this was the construction entrance/exit area. 09.13.19
09.13.19 - A look at the new plaza.
A look at the new plaza. 09.13.19
09.13.19 - Back to the unfinished area by the elevators.
Back to the unfinished area by the elevators. 09.13.19
09.13.19 - A closer look.
A closer look. 09.13.19
09.13.19 -
09.13.19
09.13.19 - From the escalator you can see the walls in front of the elevators.
From the escalator you can see the walls in front of the elevators. 09.13.19
09.13.19 - A walkway through the center is open.
A walkway through the center is open. 09.13.19
09.13.19 -
09.13.19
09.13.19 - A ground level view of the new drop off area on the left.
A ground level view of the new drop off area on the left. 09.13.19
09.13.19 - A wider view.
A wider view. 09.13.19
09.13.19 - Looking back at the new elevator.  Scaffolding on the outside.  The exterior will most likely be installed by my next visit.
Looking back at the new elevator. Scaffolding on the outside. The exterior will most likely be installed by my next visit. 09.13.19
09.13.19 - A closer look starting at the bottom and working to the top.
A closer look starting at the bottom and working to the top. 09.13.19
09.13.19 -
09.13.19
09.13.19 -
09.13.19
09.13.19 - The tram billboards still feature Galaxy's Edge.
The tram billboards still feature Galaxy's Edge. 09.13.19
09.13.19 - The trees offer a little shade but the full effect will not be felt for a couple years once they start to fill in.  Most seating was in the sun at mid afternoon.
The trees offer a little shade but the full effect will not be felt for a couple years once they start to fill in. Most seating was in the sun at mid afternoon. 09.13.19
09.13.19 -
09.13.19
09.13.19 - A closer look at one of the trees and how the bricks come up to them.
A closer look at one of the trees and how the bricks come up to them. 09.13.19
09.13.19 - Plenty of speakers in the area but the background music was not on this afternoon for most.
Plenty of speakers in the area but the background music was not on this afternoon for most. 09.13.19
09.13.19 - The new bridge over Magic Way and walkway to Downtown Disney opened this morning too.
The new bridge over Magic Way and walkway to Downtown Disney opened this morning too. 09.13.19
09.13.19 - The stairs look complete but landscaping and signage along Magic Way is still a work in progress.
The stairs look complete but landscaping and signage along Magic Way is still a work in progress. 09.13.19
09.13.19 - The new walkway and restored parking lot (note parking is still not open to the public in this lot).
The new walkway and restored parking lot (note parking is still not open to the public in this lot). 09.13.19
09.13.19 - The new signs on the bridge were not in use this afternoon.
The new signs on the bridge were not in use this afternoon. 09.13.19
09.13.19 - The ramp from the bridge to the walkway.
The ramp from the bridge to the walkway. 09.13.19
09.13.19 - Time to go try out the bridge and walkway.
Time to go try out the bridge and walkway. 09.13.19
09.13.19 - While walking it and taking pictures a couple people passed me, mostly cast members heading to Downtown Disney.
While walking it and taking pictures a couple people passed me, mostly cast members heading to Downtown Disney. 09.13.19
09.13.19 - Looking toward Disneyland Drive from the center of the bridge.
Looking toward Disneyland Drive from the center of the bridge. 09.13.19
09.13.19 - Looking toward Walnut (away from the parks to the west)
Looking toward Walnut (away from the parks to the west) 09.13.19
09.13.19 - Looking back to the parking structure. There was a cast member at the entrance to the bridge to offer directions or answer questions today.
Looking back to the parking structure. There was a cast member at the entrance to the bridge to offer directions or answer questions today. 09.13.19
09.13.19 - Continuing on.
Continuing on. 09.13.19
09.13.19 -
09.13.19
09.13.19 -
09.13.19
09.13.19 - A look down at the entrance from Magic Way and the stairs.
A look down at the entrance from Magic Way and the stairs. 09.13.19
09.13.19 - Setting off down the ramp.
Setting off down the ramp. 09.13.19
09.13.19 -
09.13.19
09.13.19 - Looking back.
Looking back. 09.13.19
09.13.19 - Looking down at the new walkway below.
Looking down at the new walkway below. 09.13.19
09.13.19 -
09.13.19
09.13.19 - Looking back at the ramp I just exited.
Looking back at the ramp I just exited. 09.13.19
09.13.19 - Signs to guide you.  Also assuming the Mickey shape is what the new statue will be by the escalators.
Signs to guide you. Also assuming the Mickey shape is what the new statue will be by the escalators. 09.13.19
09.13.19 - A quick ground level view of the new walkway heading out to Disneyland Drive and Magic Way.
A quick ground level view of the new walkway heading out to Disneyland Drive and Magic Way. 09.13.19
09.13.19 -
09.13.19
09.13.19 -
09.13.19
09.13.19 - Setting off for Downtown Disney
Setting off for Downtown Disney 09.13.19
09.13.19 -
09.13.19
09.13.19 - This will offer a nice view of the Monorail when it is running (it is still closed all afternoon).
This will offer a nice view of the Monorail when it is running (it is still closed all afternoon). 09.13.19
09.13.19 - It would be great if this would be where security was and you could cut between the Monorail and old Rain Forest to save steps.
It would be great if this would be where security was and you could cut between the Monorail and old Rain Forest to save steps. 09.13.19
09.13.19 - Instead you have to walk down to security where has been between the former ESPN & Rainforest.
Instead you have to walk down to security where has been between the former ESPN & Rainforest. 09.13.19
Back to previous page