09.07.18 - Looking over the tram stop at the new parking structure construction.
Looking over the tram stop at the new parking structure construction. 09.07.18
09.07.18 - The escalator structure is rising quickly with workers on what appears to be the 5th floor.
The escalator structure is rising quickly with workers on what appears to be the 5th floor. 09.07.18
09.07.18 - The right side is up to 4 floors now.
The right side is up to 4 floors now. 09.07.18
09.07.18 - In front they have started the footers and support columns for the escalators.
In front they have started the footers and support columns for the escalators. 09.07.18
09.07.18 - Continuing to the right you can see various stages of completion starting from the ground level then moving up to 2 and finally up to three.
Continuing to the right you can see various stages of completion starting from the ground level then moving up to 2 and finally up to three. 09.07.18
09.07.18 - The bridge connecting the two structures on the 2nd floor is poured as well as the first sections of the 3rd floor.
The bridge connecting the two structures on the 2nd floor is poured as well as the first sections of the 3rd floor. 09.07.18
09.07.18 - A closer look at the bridge.
A closer look at the bridge. 09.07.18
09.07.18 - The first/lower ramp is still paused.  The 2nd one is catching up.
The first/lower ramp is still paused. The 2nd one is catching up. 09.07.18
09.07.18 - Looking out you can see decking for the 3rd floor in the middle and beyond for the 2nd floor on the back half.
Looking out you can see decking for the 3rd floor in the middle and beyond for the 2nd floor on the back half. 09.07.18
09.07.18 - Concrete on the third floor is poured on the near portion.
Concrete on the third floor is poured on the near portion. 09.07.18
09.07.18 - The second ramp is taking shape and looks just about ready for concrete.  This appeared to be the connection point for the 4th floor.
The second ramp is taking shape and looks just about ready for concrete. This appeared to be the connection point for the 4th floor. 09.07.18
09.07.18 - Here you can see supports for the 2nd ramp as well as the connection point of the 1st to the 3rd floor.
Here you can see supports for the 2nd ramp as well as the connection point of the 1st to the 3rd floor. 09.07.18
09.07.18 -
09.07.18
09.07.18 - Crews working on a recently poured section of the 2nd floor on the back half of the project.
Crews working on a recently poured section of the 2nd floor on the back half of the project. 09.07.18
09.07.18 -
09.07.18
09.07.18 - The bridge connection along the back of the structures taking shape.
The bridge connection along the back of the structures taking shape. 09.07.18
09.07.18 - The second floor waiting for the edge as well as supports to start the 3rd floor.
The second floor waiting for the edge as well as supports to start the 3rd floor. 09.07.18
09.07.18 -
09.07.18
09.07.18 - A closer look at where the ramp meets the garage on the 3rd floor.
A closer look at where the ramp meets the garage on the 3rd floor. 09.07.18
09.07.18 - More of the ramp.
More of the ramp. 09.07.18
09.07.18 - Under the 1st rampt he supports are now removed.
Under the 1st rampt he supports are now removed. 09.07.18
09.07.18 - Looks like the utility/conduit work kis wrapping up.
Looks like the utility/conduit work kis wrapping up. 09.07.18
09.07.18 - A look at connection.  Looks to be a path for cars and one for pedestrians.
A look at connection. Looks to be a path for cars and one for pedestrians. 09.07.18
09.07.18 -
09.07.18
09.07.18 - From the escalator heading down.
From the escalator heading down. 09.07.18
09.07.18 -
09.07.18
09.07.18 - Most of the supports on the first floor are now removed.
Most of the supports on the first floor are now removed. 09.07.18