08.24.18 - The escalator area is rising above the third floor with forms coming off the third floor and supports for the fourth going up.
The escalator area is rising above the third floor with forms coming off the third floor and supports for the fourth going up. 08.24.18
08.24.18 - A closer look.
A closer look. 08.24.18
08.24.18 -
08.24.18
08.24.18 -
08.24.18
08.24.18 - Continuing to pan to the right
Continuing to pan to the right 08.24.18
08.24.18 - Looking across the structure you can see various phases.  Closest is decking for the 3rd floor. Then concrete on the 2nd. Then rebar for the 2nd.  Further along decking for the 2nd going in and beyond that concrete on the ground level.
Looking across the structure you can see various phases. Closest is decking for the 3rd floor. Then concrete on the 2nd. Then rebar for the 2nd. Further along decking for the 2nd going in and beyond that concrete on the ground level. 08.24.18
08.24.18 - A look at the 3rd floor taking shape.
A look at the 3rd floor taking shape. 08.24.18
08.24.18 -
08.24.18
08.24.18 - It appears there will be two bridges/spans connecting to the existing structure on each level.  This one close to the tram route and one on the back side.
It appears there will be two bridges/spans connecting to the existing structure on each level. This one close to the tram route and one on the back side. 08.24.18
08.24.18 - The second ramp is taking shape above the first.  This looks to be a level spot for the 4th floor connection.
The second ramp is taking shape above the first. This looks to be a level spot for the 4th floor connection. 08.24.18
08.24.18 -
08.24.18
08.24.18 - Here you can see a team working on the 1st/lower ramp connection to the third floor.
Here you can see a team working on the 1st/lower ramp connection to the third floor. 08.24.18
08.24.18 -
08.24.18
08.24.18 - A better view of the second ramp taking shape.  Beyond it they are pumping/pouring concrete for the second floor and in the distance you can see the back bridge.
A better view of the second ramp taking shape. Beyond it they are pumping/pouring concrete for the second floor and in the distance you can see the back bridge. 08.24.18
08.24.18 - A closer look at the concrete pour.
A closer look at the concrete pour. 08.24.18
08.24.18 -
08.24.18
08.24.18 - Looking toward the front bridge.
Looking toward the front bridge. 08.24.18
08.24.18 -
08.24.18
08.24.18 - Another look across the project and you can see the progression
Another look across the project and you can see the progression 08.24.18
08.24.18 - The second ramp .
The second ramp . 08.24.18
08.24.18 - Underneath the first supports are removed and looks like utility work going on.
Underneath the first supports are removed and looks like utility work going on. 08.24.18
08.24.18 - Crews removing more of the supports.
Crews removing more of the supports. 08.24.18
08.24.18 - The bridge nearest the trams
The bridge nearest the trams 08.24.18
08.24.18 -
08.24.18
08.24.18 -
08.24.18
08.24.18 -
08.24.18
08.24.18 - From the escalator
From the escalator 08.24.18
08.24.18 -
08.24.18
08.24.18 - From ground level
From ground level 08.24.18
08.24.18 - Walking along Magic Way.
Walking along Magic Way. 08.24.18
08.24.18 -
08.24.18
08.24.18 -
08.24.18
08.24.18 -
08.24.18
08.24.18 -
08.24.18
08.24.18 -
08.24.18
08.24.18 - From across the street.
From across the street. 08.24.18