08.03.18 - The escalator portion of the new structure has had the second floor poured and is moving up to the 3rd level.
The escalator portion of the new structure has had the second floor poured and is moving up to the 3rd level. 08.03.18
08.03.18 - A closer look at the wall of the 2nd floor.
A closer look at the wall of the 2nd floor. 08.03.18
08.03.18 - You can see the exterior wall and then inside the temporary supports for the 3rd floor.
You can see the exterior wall and then inside the temporary supports for the 3rd floor. 08.03.18
08.03.18 - Off to the right the decking for the 3rd floor is going in.
Off to the right the decking for the 3rd floor is going in. 08.03.18
08.03.18 - Panning further right decking for the second floor of the main garage area is being installed.
Panning further right decking for the second floor of the main garage area is being installed. 08.03.18
08.03.18 - A wide view of the area.
A wide view of the area. 08.03.18
08.03.18 - Here you can see the portion of the second floor support/decking that is in place.
Here you can see the portion of the second floor support/decking that is in place. 08.03.18
08.03.18 -
08.03.18
08.03.18 -
08.03.18
08.03.18 - Crews working on support columns
Crews working on support columns 08.03.18
08.03.18 - In the foreground will be a connection to the 3rd floor (a little hard to tell but that oopening is a floor above the decking)
In the foreground will be a connection to the 3rd floor (a little hard to tell but that oopening is a floor above the decking) 08.03.18
08.03.18 - The ramp stops right now just shy of the 4th floor.
The ramp stops right now just shy of the 4th floor. 08.03.18
08.03.18 - A closer look at the 3rd floor connection.
A closer look at the 3rd floor connection. 08.03.18
08.03.18 -
08.03.18
08.03.18 - Continuing to the right down the ramp.
Continuing to the right down the ramp. 08.03.18
08.03.18 -
08.03.18
08.03.18 - Here is the connection point for the 2nd floor.
Here is the connection point for the 2nd floor. 08.03.18
08.03.18 -
08.03.18
08.03.18 - In the background you can see a section of the ground level that was recently poured and to the left the next section looks just about ready for concrete.
In the background you can see a section of the ground level that was recently poured and to the left the next section looks just about ready for concrete. 08.03.18
08.03.18 - A better view.. starting on the right a finished section, in the middle rebar down and ready for concrete, then to the left working on leveling out the next section.
A better view.. starting on the right a finished section, in the middle rebar down and ready for concrete, then to the left working on leveling out the next section. 08.03.18
08.03.18 -
08.03.18
08.03.18 - The second ramp has stopped temporarily to give the first ramp time to set.  It appears the ramp configuration for this structure will be different and instead of each ramp reaching two floors it appears two ramps will reach all floors.  Maybe one entrance and one exit?
The second ramp has stopped temporarily to give the first ramp time to set. It appears the ramp configuration for this structure will be different and instead of each ramp reaching two floors it appears two ramps will reach all floors. Maybe one entrance and one exit? 08.03.18
08.03.18 - The second ramp has some rebar for the roadbed and forms starting to go up.
The second ramp has some rebar for the roadbed and forms starting to go up. 08.03.18
08.03.18 - A closer look at the ground level work.
A closer look at the ground level work. 08.03.18
08.03.18 - A closer look at support rebar going in for the 2nd floor.
A closer look at support rebar going in for the 2nd floor. 08.03.18
08.03.18 - The view from the escalator.
The view from the escalator. 08.03.18
08.03.18 -
08.03.18
08.03.18 -
08.03.18
08.03.18 - From ground level.
From ground level. 08.03.18
08.03.18 - A reminder of what the finished product will look like.
A reminder of what the finished product will look like. 08.03.18