08.02.19 - The Mickey and Friends parking structure is being extended slightly to connect to a new elevator shaft that will be added.
The Mickey and Friends parking structure is being extended slightly to connect to a new elevator shaft that will be added. 08.02.19
08.02.19 - The forest in the tram plaza has grown since my last visit. Today they were pouring concrete for planters.
The forest in the tram plaza has grown since my last visit. Today they were pouring concrete for planters. 08.02.19
08.02.19 - A closer look, the round planters are concrete around the palm trees.
A closer look, the round planters are concrete around the palm trees. 08.02.19
08.02.19 - On left side concrete for the front ramp of the tram drop off location is in place.
On left side concrete for the front ramp of the tram drop off location is in place. 08.02.19
08.02.19 - Conduit and piping under what will become the 2nd tram drop off location in this area.
Conduit and piping under what will become the 2nd tram drop off location in this area. 08.02.19
08.02.19 - They were cleaning up after a concrete pour when I was there.
They were cleaning up after a concrete pour when I was there. 08.02.19
08.02.19 - A closer look at one of the planters
A closer look at one of the planters 08.02.19
08.02.19 -
08.02.19
08.02.19 - A closer look at the conduit/pipes.
A closer look at the conduit/pipes. 08.02.19
08.02.19 - A worker finishing up from the concrete pour.
A worker finishing up from the concrete pour. 08.02.19
08.02.19 - A closer look.
A closer look. 08.02.19
08.02.19 -
08.02.19
08.02.19 - Looking out at the growing forest.  More palm trees are coming.
Looking out at the growing forest. More palm trees are coming. 08.02.19
08.02.19 - A wider look.
A wider look. 08.02.19
08.02.19 - A side view of the new connection span taking shape for the Mickey and Friends elevator.
A side view of the new connection span taking shape for the Mickey and Friends elevator. 08.02.19
08.02.19 - Another look at the plaza
Another look at the plaza 08.02.19
08.02.19 - The elevator work from the other side.
The elevator work from the other side. 08.02.19
08.02.19 - The pit where the new shaft will be installed.
The pit where the new shaft will be installed. 08.02.19
08.02.19 - A couple more views of the plaza from this angle.
A couple more views of the plaza from this angle. 08.02.19
08.02.19 -
08.02.19
08.02.19 - A wider view of the new elevator project..
A wider view of the new elevator project.. 08.02.19
08.02.19 -
08.02.19
08.02.19 -
08.02.19
08.02.19 -
08.02.19
08.02.19 - The walkway to Downtown Disney is taking shape.
The walkway to Downtown Disney is taking shape. 08.02.19
08.02.19 - Side panels have been added to the ramp from the new bridge to the new walkway.
Side panels have been added to the ramp from the new bridge to the new walkway. 08.02.19
08.02.19 - Another look at the panels.
Another look at the panels. 08.02.19
08.02.19 - Panning further to the right you can see the ground level walkway.  Along it are concrete footers and conduit.  Assuming for lights and signs.
Panning further to the right you can see the ground level walkway. Along it are concrete footers and conduit. Assuming for lights and signs. 08.02.19
08.02.19 - To the right here you can see the curb that will be where the reconfigured parking lot will come to.
To the right here you can see the curb that will be where the reconfigured parking lot will come to. 08.02.19
08.02.19 -
08.02.19
08.02.19 - In the distance a team is working on placing trees along the walkway.
In the distance a team is working on placing trees along the walkway. 08.02.19
08.02.19 -
08.02.19
08.02.19 -
08.02.19
08.02.19 - A wider view of the new bridge and beyond it the walkway.
A wider view of the new bridge and beyond it the walkway. 08.02.19
08.02.19 - to the right of center you can see the curb continuing.
to the right of center you can see the curb continuing. 08.02.19
08.02.19 - The view from the second floor.
The view from the second floor. 08.02.19
08.02.19 - From ground level.
From ground level. 08.02.19
08.02.19 - The view from the corner of Magic Way and Disneyland Drive.  They were painting/sealing the concrete.
The view from the corner of Magic Way and Disneyland Drive. They were painting/sealing the concrete. 08.02.19
08.02.19 - Another team was working on wiring under the walkway.
Another team was working on wiring under the walkway. 08.02.19
08.02.19 -
08.02.19
08.02.19 - The future parking lot area.
The future parking lot area. 08.02.19
08.02.19 - One last look at the area.
One last look at the area. 08.02.19