07.13.18 - A look from near the Mickey and Friends escalators.  Beyond the tram turn around the new structure escalator area is rising up.
A look from near the Mickey and Friends escalators. Beyond the tram turn around the new structure escalator area is rising up. 07.13.18
07.13.18 - A closer look.
A closer look. 07.13.18
07.13.18 - Rebar and support structure for the second floor is being installed.
Rebar and support structure for the second floor is being installed. 07.13.18
07.13.18 - Panning to the right more you can see the columns are being prepared for the second floor.
Panning to the right more you can see the columns are being prepared for the second floor. 07.13.18
07.13.18 - Temporary support scaffolding as well as forms for the concrete floor supports are being set up.
Temporary support scaffolding as well as forms for the concrete floor supports are being set up. 07.13.18
07.13.18 -
07.13.18
07.13.18 - Parallel to the Mickey and Friends structure the edge support as well as ramp supports are taking shape.
Parallel to the Mickey and Friends structure the edge support as well as ramp supports are taking shape. 07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 - The first two ramps have had their concrete deck poured.
The first two ramps have had their concrete deck poured. 07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 - Throughout the site more columns are taking shape. It appears the drilling is complete.  The round columns are interior support and the rectangular ones are edge support for the structure segments.
Throughout the site more columns are taking shape. It appears the drilling is complete. The round columns are interior support and the rectangular ones are edge support for the structure segments. 07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 - Looks like utility work throughout the site with more pipes going in.
Looks like utility work throughout the site with more pipes going in. 07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 - A closer look at the 2nd floor supports.
A closer look at the 2nd floor supports. 07.13.18
07.13.18 - From the escalator.
From the escalator. 07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
07.13.18 - A ground level view from the tram off load area.
A ground level view from the tram off load area. 07.13.18
07.13.18 -
07.13.18
07.13.18 - From the Magic Way sidewalk the second floor supports for the escalator area.
From the Magic Way sidewalk the second floor supports for the escalator area. 07.13.18
07.13.18 -
07.13.18
07.13.18 - Columns marking the edge of the garage closest to the street.
Columns marking the edge of the garage closest to the street. 07.13.18
07.13.18 -
07.13.18
07.13.18 -
07.13.18
Back to previous page